FRAMING x COLORADO

Framing contractor requirements in Colorado.

There is no Colorado framing license, no state carpentry board and no statutory threshold. Structural framing is governed by the building code the local jurisdiction adopted and by the inspection sequence that code sets — and by whoever holds the general contractor license the permit was issued under.

Where it gets interesting is the licensing map. Denver has no framing certificate at all; framing falls inside the Class A, B, B-2 or C construction scopes, or under Specialty Class D categories like Open Deck Installer and Non-Structural Residential Remodel. Pikes Peak Regional Building Department likewise absorbs framing into Building Contractor A, B, C or E. Aurora licenses no framer. Fort Collins, alone among the four, lists Framing as its own specialized trade contractor category with an ICC exam — the exception that proves how little Colorado standardizes.

STATE LICENSE
NoneSee what applies
STATUTE
HB22-1362 (2022) — local building and energy code adoption
RENEWAL
n/a — no state credentialNone required by the state
VERIFIED
September 2026Official sources
FILE · FRAMING x COLORADO
Compliance Dossier
Public
File
September 2026
STATE AUTHORITYNone for this trade
STATUTE / CODEHB22-1362 (2022) — local building and energy code adoption
SCOPEStatewide · Colorado
RENEWALn/a — no state credential
CONTINUING ED.None required by the state
LOCAL OFFICES8 counties on file
FILE FRAMINGSCOPE STATEWIDE · COLORADOTYPE VERIFIED RULE FILE
VERIFIED September 2026STATUS PUBLIC REFERENCE
What this file settlesThe Colorado rules for framing contractors, verified against official sources.
LICENSE TRUTH
Colorado licenses no framers statewide — but Fort Collins does, with its own Framing category and ICC exam, which makes framing one of the sharpest examples of how much Colorado compliance depends on which city you are standing in.
STATE ↔ LOCAL
Framing is the clearest illustration of Colorado's patchwork. Fort Collins publishes Framing among its specialized trade contractor categories and tests it through ICC — so a framing crew working Fort Collins holds a credential that does not exist anywhere else on the Front Range. Denver has no framing certificate: framing sits inside the Class A, B, B-2 and C construction scopes, with Specialty Class D certificates covering adjacent work such as Open Deck Installer, Pre-Cast Concrete Building Units and Non-Structural Residential Remodel. Pikes Peak Regional Building Department is the same, absorbing framing into Building Contractor A, B and C, with Building Contractor E covering decks, patio covers, detached garages and interior nonstructural remodel. Aurora's license list has no framing entry at all. Because no state licensing statute preempts anyone, each of these jurisdictions is free to add a framing category tomorrow — and to charge for it.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How framing work is governed in Colorado.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — NO FRAMING LICENSE
No contractor or carpentry board exists
NO STATE LICENSENO STATE EXAMNO STATE THRESHOLD
STATE — ENVIRONMENTAL + INSURANCE
CDPHE · CDLE
ASBESTOS BEFORE DEMOWORKERS' COMP AT ONE EMPLOYEE
LOCAL — CODE AND CREDENTIAL
City or regional building department
ADOPTED BUILDING CODEFRAMING INSPECTIONLICENSE WHERE REQUIRED

Read it bottom-up.

Framing is the clearest illustration of Colorado's patchwork. Fort Collins publishes Framing among its specialized trade contractor categories and tests it through ICC — so a framing crew working Fort Collins holds a credential that does not exist anywhere else on the Front Range. Denver has no framing certificate: framing sits inside the Class A, B, B-2 and C construction scopes, with Specialty Class D certificates covering adjacent work such as Open Deck Installer, Pre-Cast Concrete Building Units and Non-Structural Residential Remodel. Pikes Peak Regional Building Department is the same, absorbing framing into Building Contractor A, B and C, with Building Contractor E covering decks, patio covers, detached garages and interior nonstructural remodel. Aurora's license list has no framing entry at all. Because no state licensing statute preempts anyone, each of these jurisdictions is free to add a framing category tomorrow — and to charge for it.

The local offices section below names the exact permit desk for every Colorado county on file.

Source · State and local issuing authoritiesLast verified · September 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
State Framing LicenseNo such credential exists in Colorado
$0
No Title 12 contractor article
OPTIONAL
Fort Collins Framing LicenseThe one Front Range jurisdiction with a standalone framing category, tested through ICC
City of Fort Collins
City fee schedule
Per local term
Fort Collins contractor licensing
CONDITIONAL
General Contractor License (elsewhere)In Denver, Aurora and the Pikes Peak region framing is performed under the prime's contractor class
City or regional building department
$235–$392 by jurisdiction
2–3 year terms
Denver Construction Certificates; PPRBD RBC203
REQUIRED
Building Permit + Framing InspectionThe framing inspection is a scheduled stage of the locally adopted code, before cover
City or regional building department
By valuation
Per project
Local building code
REQUIRED
Workers' CompensationColorado defines an employer as anyone with one or more persons in service under a contract of hire
Private carrier or Pinnacol
Premium by payroll
Before hiring
C.R.S. § 8-40-203(1)(b)
REQUIRED
Asbestos Inspection Before DemolitionTaking out a load-supporting structural member is demolition; the area must be inspected and a notification filed even when no asbestos is found
CDPHE Air Pollution Control Division
Inspector + notification fee
Ten working days
AQCC Regulation 8, Part B
CONDITIONAL
Energy Code ComplianceFraming details carry the envelope; local codes must meet 2021 IECC-equivalent performance plus electric and solar ready
Local government
Design and material cost
On each local code update
HB22-1362 (2022)
REQUIRED
§ 03 · Year-One Cost

What it costs to start framing in Colorado.

Published fees from the issuing authorities, as of September 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Colorado · Framing
State framing licenseNone exists$0
Fort Collins framing licenseSpecialized trade category with an ICC examCity fee schedule
Denver contractor licenseFraming runs under the GC class; no framing certificate exists$250.00
Building permitPriced on project valuation by the local departmentBy valuation
Asbestos inspection and notificationRequired before demolition of structural membersInspector + division fee
Workers' compensationRequired from the first employeeBy payroll
Year-one floor$0 statewide · licensing cost depends entirely on the jurisdiction
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
One city licenses it, three do not

Fort Collins lists Framing as its own specialized trade contractor category with an ICC exam. Denver, Aurora and Pikes Peak Regional Building Department have no framing credential and absorb the work into the general contractor classes.

NOTE
Pulling out a beam is demolition

CDPHE defines demolition as the wrecking or taking out of any load-supporting structural member, which pulls structural framing work into the asbestos notification regime even when no asbestos is found.

NOTE
Insurance starts at one employee

Colorado's workers' compensation act reaches every private employer with one or more persons in service under a contract of hire — there is no small-crew exemption for framers.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new framing contractor in Colorado. Actual agency processing times are noted in the ledger above.

1
STEP 1
Identify the licensing jurisdiction
Fort Collins licenses framing; most do not
2
STEP 2
License or subcontract under the prime's class
Local building department
3
STEP 3
Bind workers' compensation
Carrier or Pinnacol — from employee one
4
STEP 4
Inspect for asbestos before removing structure
Certified Asbestos Building Inspector
5
STEP 5
Frame to the adopted code and energy details
Local building code + HB22-1362
6
STEP 6
Pass the framing inspection before cover
Local building department
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Check whether your city licenses framing
Fort Collins does, with an ICC exam. Denver, Aurora and the Pikes Peak region do not, and the work runs under the general contractor class instead.
LOCALSCOPEFort Collins contractor licensing
Local building departmentIssuing authority
02
Work under a licensed prime where you are not licensed
In jurisdictions with no framing category the permit is held by a licensed contractor whose class covers the structure being built.
LOCALPERMITDenver Construction Certificates
Licensed contractorIssuing authority
03
Treat structural removal as demolition
Taking out a load-supporting member triggers CDPHE's demolition rules, including an asbestos inspection and a notification form filed even when nothing is found.
ENVIRONMENTALDEMOLITIONAQCC Regulation 8, Part B
CDPHEIssuing authority
04
Carry workers' comp from the first employee
Framing is a high-rate class and Colorado gives no small-employer exemption.
INSURANCESTATEC.R.S. § 8-40-203(1)(b)
Carrier or PinnacolIssuing authority
05
Frame for the current energy code
Advanced framing details, continuous insulation and air sealing follow the energy code your jurisdiction adopted on its last code update under HB22-1362.
CODESTATEWIDEHB22-1362 (2022)
Local governmentIssuing authority
06
Schedule the framing inspection before cover
The adopted building code sets a framing inspection stage; covering the work first means opening it back up.
PERMITSEQUENCELocal building code
Local building departmentIssuing authority
§ 06 · Enforcement

What the law does about unlicensed framing work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
Local building codesStatute

Unlicensed framing

There is no Colorado framing license and therefore no state unlicensed-practice offense. Where a city licenses framing, working without it is an ordinance violation and the permit will not issue.

ConsequenceNo state licensing penalty exists; local ordinance enforcement applies
§
AQCC Regulation 8, Part BStatute

Demolition without notification

Removing load-supporting structural members without the required asbestos inspection and Demolition Notification Application, filed with a ten-working-day notice period, violates Colorado's air quality asbestos rule.

ConsequenceAir Pollution Control Division enforcement
§
C.R.S. § 8-43-409(1)Statute

Working without workers' compensation

An employer in default on coverage shall not continue business operations while the default continues, and may be fined for every day of the default.

ConsequenceCease and desist; up to $250/day first violation, $250–$500/day thereafter
§ 07 · Local Offices

Where the permit is filed, county by county.

Inside city limits, the city office listed here issues the permit; the county office serves unincorporated areas. Every office links to its official page.

§ 08 · Colorado FAQ

Questions framing contractors ask about Colorado.

Q01Do framers need a license in Colorado?+
Not from the state. Whether you need one locally depends entirely on the jurisdiction: Fort Collins licenses Framing as a specialized trade with an ICC exam, while Denver, Aurora and Pikes Peak Regional Building Department have no framing credential and treat the work as part of the general contractor's scope.
Q02Who pulls the permit if there is no framing license?+
The contractor whose class covers the structure. In Denver that is a Class A, B, B-2 or C license holder behind a supervisor certificate; in the Pikes Peak region it is a Building Contractor A, B, C or E.
Q03Does removing a bearing wall trigger state rules?+
Yes. CDPHE treats the wrecking or taking out of any load-supporting structural member as demolition, which requires an asbestos inspection by a Colorado-certified Asbestos Building Inspector and a Demolition Notification Application filed with a ten-working-day notice period, even when no asbestos is found.

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.