HomeArizonaGeneral Contracting
GENERAL CONTRACTING x ARIZONA

General Contracting contractor requirements in Arizona.

Arizona does not split contractor licensing between a state board and city registrations. The Registrar of Contractors (AZ ROC) licenses the trade statewide, and A.R.S. § 32-1101.01 forbids cities, charter cities, towns and counties from requiring their own license of anyone the state has already licensed. What a city can still do is refuse the permit: A.R.S. § 32-1169 makes every permit desk collect a signed statement of the applicant's license number before issuing.

The general classes are B (General Residential), B-3 (General Remodeling and Repair), B-1 (General Commercial), B-2 (General Small Commercial, capped at $2,000,000 per project), and the dual KB-1 and KB-2. The trap sits inside every one of them: electrical, plumbing, air conditioning, boilers, swimming pools, spas and water wells must be subcontracted to separately licensed contractors. A B-1 holder cannot legally wire or plumb its own building.

STATE LICENSE
RequiredArizona Registrar of Contractors (AZ ROC)
STATUTE
A.R.S. §§ 32-1101 – 32-1188
RENEWAL
Biennial, staggered across the twelve monthsNone required by the Registrar
VERIFIED
September 2026Official sources
FILE · GENERAL CONTRACTING x ARIZONA
Compliance Dossier
Public
File
September 2026
STATE AUTHORITYArizona Registrar of Contractors (AZ ROC)
STATUTE / CODEA.R.S. §§ 32-1101 – 32-1188
SCOPEStatewide · Arizona
RENEWALBiennial, staggered across the twelve months
CONTINUING ED.None required by the Registrar
LOCAL OFFICES2 counties on file
FILE GENERAL CONTRACTINGSCOPE STATEWIDE · ARIZONATYPE VERIFIED RULE FILE
VERIFIED September 2026STATUS PUBLIC REFERENCE
What this file settlesThe Arizona rules for general contracting contractors, verified against official sources.
LICENSE TRUTH
Arizona has one construction licensing authority — the Registrar of Contractors — and a general building license is required once a job crosses $1,000 or needs a building permit, whichever comes first.
STATE ↔ LOCAL
The license is statewide and locally unduplicable: A.R.S. § 32-1101.01 bars cities, towns and counties from imposing their own contractor license. What they control is the permit. Under A.R.S. § 32-1169 the Phoenix Planning and Development Department (SHAPE PHX), Tucson Planning and Development Services and Maricopa County Planning and Development (Permit Center, for unincorporated areas) must each collect a signed statement of your license number — or the basis of your exemption plus the licensed subcontractors' names and numbers — before issuing. A false statement on that application is unsworn falsification. Separately, prime contracting is taxed under A.R.S. § 42-5075 on 65% of gross proceeds, with both state and city transaction privilege tax due.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How general contracting work is governed in Arizona.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — THE ONLY LICENSE
Arizona Registrar of Contractors
CLASSIFICATIONQUALIFYING PARTYLICENSE BOND
STATE — MONEY LAYER
ROC recovery fund · Dept of Revenue
RECOVERY FUND ASSESSMENTTPT PRIME CONTRACTING
LOCAL — THE PERMIT DESK
Phoenix PDD · Tucson PDSD · Maricopa County
LICENSE NUMBER ON APPLICATIONPLAN REVIEW & INSPECTIONS

Read it bottom-up.

The license is statewide and locally unduplicable: A.R.S. § 32-1101.01 bars cities, towns and counties from imposing their own contractor license. What they control is the permit. Under A.R.S. § 32-1169 the Phoenix Planning and Development Department (SHAPE PHX), Tucson Planning and Development Services and Maricopa County Planning and Development (Permit Center, for unincorporated areas) must each collect a signed statement of your license number — or the basis of your exemption plus the licensed subcontractors' names and numbers — before issuing. A false statement on that application is unsworn falsification. Separately, prime contracting is taxed under A.R.S. § 42-5075 on 65% of gross proceeds, with both state and city transaction privilege tax due.

The local offices section below names the exact permit desk for every Arizona county on file.

Source · Arizona Registrar of Contractors (AZ ROC)Last verified · September 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
ROC General Building LicenseRequired once labor + materials exceed $1,000 or a permit is required
AZ ROC
$780–$1,050 per 2-year term
Biennial
A.R.S. § 32-1151
REQUIRED
Qualifying Party4 years practical or management trade experience, 2 within the last 10
AZ ROC
$61 SRE + $66 trade exam
Exam-based
A.R.S. § 32-1122(E)
REQUIRED
License BondAmount set by class and contemplated annual volume; cancellation suspends the license
Surety or cash deposit
$5,000–$100,000
Continuous
A.R.S. § 32-1152(B)
REQUIRED
Residential Recovery FundResidential and dual licensees only — assessment or a $200,000 bond instead
AZ ROC
$370 new / $270 renewal
Per 2-year term
A.R.S. § 32-1152(C)
CONDITIONAL
Background CheckEvery person named on the application; expires 90 days after completion
ROC vendor
Vendor rate
Before submission
roc.az.gov applying for a license
REQUIRED
TPT LicensePrime contracting is taxed on 65% of gross proceeds; MRRA-only work is treated differently
AZ Dept of Revenue
State + city rates
Before first contract
A.R.S. § 42-5075
REQUIRED
§ 03 · Year-One Cost

What it costs to start general contracting in Arizona.

Published fees from the issuing authorities, as of September 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Arizona · General Contracting
General Commercial (B-1/B-2) new license$200 application + $580 license$780
General Residential (B/B-3) new license$180 + $320 + $370 recovery fund$870
General Dual (KB-1/KB-2) new license$200 + $480 + $370 recovery fund$1,050
Statutes and Rules Exam (SRE)Paid to Gmetrix, online, open book$61
Trade examPaid to PSI; NASCLA commercial general building exam is $106 + $30 transcript$66
License bondPremium on a $5,000–$100,000 penal sumMarket rate
Year-one floor$780–$1,050 in state fees for a 2-year license, plus bond and exams
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
No net worth test

Arizona does not ask a general contractor to prove net worth. The financial gate is the license bond sized to contemplated annual volume, plus the residential recovery fund assessment.

NOTE
The exams were consolidated

B, B-3 and CR-61 now share one trade exam, and B-1, B-2, KB-1 and KB-2 share another. A passing score is 70%, and results must be within two years of the application.

NOTE
Fee waiver for some applicants

Under A.R.S. § 41-1080.01 the Registrar waives the initial application fee for a first-time sole proprietor who is a military spouse, a veteran discharged within two years, or under 200% of the federal poverty guidelines — but the recovery fund assessment is still owed.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new general contracting contractor in Arizona. Actual agency processing times are noted in the ledger above.

1
STEP 1
Pick the classification
B · B-3 · B-1 · B-2 · KB-1 · KB-2
2
STEP 2
Identify a qualifying party
4 years experience, 2 within 10
3
STEP 3
Pass the SRE and the trade exam
Gmetrix + PSI, 70% each
4
STEP 4
Bond, background checks, entity filing
Surety · ROC vendor · AZ Corp Commission
5
STEP 5
Submit the application and fees
AZ ROC portal
6
STEP 6
Register for TPT and pull the first permit
ADOR · local permit desk
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Confirm the job clears the exemption
The $1,000 casual-or-minor exemption dies the moment a building permit is required, the work is part of a larger operation, or the contract is split to evade the cap.
STATESCOPEA.R.S. § 32-1121(A)(14)
AZ ROCIssuing authority
02
Subcontract the carve-outs
Electrical, plumbing, air conditioning, boilers, swimming pools, spas and water wells must go to separately licensed contractors — the general classes exclude them by their own terms.
STATESCOPEroc.az.gov license classifications
AZ ROCIssuing authority
03
Keep the bond continuous
When a surety cancels, the license is suspended by operation of law on the cancellation date unless a replacement is already on file.
BONDAUTOMATICA.R.S. § 32-1152(F)
SuretyIssuing authority
04
Put the statutory terms in every contract over $1,000
License number, jobsite, completion date, total price, deposit and progress payments, plus the ROC complaint notice in at least ten-point bold type.
CONTRACTLEGALA.R.S. § 32-1158
YouIssuing authority
05
Renew on the staggered biennial cycle
The Registrar staggers licensure across all twelve months and renews biennially; late renewal carries a $50 penalty and a suspended license can be reactivated within one year.
RENEWALDEADLINEA.R.S. §§ 32-1123.01, 32-1125, 32-1126(D)
AZ ROCIssuing authority
§ 06 · Enforcement

What the law does about unlicensed general contracting work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
A.R.S. §§ 32-1151, 32-1164Statute

Unlicensed contracting

Engaging in the business of contracting, bidding, or holding yourself out as a contractor without a license in good standing is criminal.

ConsequenceClass 1 misdemeanor; fine ≥ $1,000 (≥ $2,000 repeat)
§
A.R.S. § 32-1153Statute

No right to collect

An unlicensed contractor cannot commence or maintain any action in an Arizona court for collection of compensation for work that required a license.

ConsequenceClaim barred
§
A.R.S. § 32-1166.01Statute

Citations and civil penalties

The Registrar may issue a cease-and-desist citation carrying a civil penalty for each violation, and each violation by an unlicensed person is a separate offense.

Consequence$200–$2,500
§ 07 · Local Offices

Where the permit is filed, county by county.

Inside city limits, the city office listed here issues the permit; the county office serves unincorporated areas. Every office links to its official page.

§ 08 · Arizona FAQ

Questions general contracting contractors ask about Arizona.

Q01Do I need a contractor license in Arizona?+
Yes for essentially all commercial construction work. The exemption in A.R.S. § 32-1121(A)(14) covers only work of a casual or minor nature with an aggregate contract price under $1,000, and it does not apply when a local building permit is required, when the work is part of a larger project, or when a job is divided into sub-$1,000 contracts to evade the chapter.
Q02Can my city make me get a second license?+
No. A.R.S. § 32-1101.01 declares contractor licensing a state function and bars cities, charter cities, towns and counties from requiring a license of a contractor already licensed by statute. Local governments still run permits, inspections and transaction privilege tax.
Q03What happens if I build without the license?+
Unlicensed contracting is a class 1 misdemeanor with a fine of at least $1,000 for a first offense and $2,000 for later offenses (A.R.S. § 32-1164), and under A.R.S. § 32-1153 you cannot bring or maintain any action in an Arizona court to collect compensation for the work.
Q04Is there a net worth or continuing-education requirement?+
Neither. Arizona uses a license bond sized to your contemplated annual volume instead of a net worth test, and the contractor chapter imposes no continuing education — the only education provision is the optional filing of an apprenticeship completion certificate under A.R.S. § 32-1129.
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on September 2026.

Pending verification: ROC background-check vendor fee amount (set by the vendor, not published on roc.az.gov) · Typical elapsed time from a complete application to license issuance — the ROC publishes no service-level target on its applying-for-a-license page

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.