HomeKansasElectrical
ELECTRICAL x KANSAS

Electrical contractor requirements in Kansas.

There is no Kansas electrical board. K.S.A. 12-1525 designates the ICC, IAPMO, or Prometric examinations in effect on July 1, 2008 as the standard tests for electrical contractors and master, journeyman, and residential electricians, and K.S.A. 12-1526 sets the rules any licensing city or county must follow: no questions beyond the designated exam, a 75% passing score, a uniform fee, and continuing education of 12 hours every two years (or 6 a year), at least half of it code.

The payoff is portability: a certificate of competency from the designated exam, with the required experience, is valid proof of competency in every Kansas jurisdiction that licenses electricians without retesting. Journeyman and residential certificates need two years of documented field experience (up to one year by 930+ hours of trade schooling); master certificates need two years as a journeyman. A locality may use its own exam instead, but that license is valid only locally unless a reciprocal agreement exists (K.S.A. 12-1527).

STATE LICENSE
NoneSee what applies
STATUTE
K.S.A. 12-1525 to 12-1528
RENEWAL
Local — JoCo annual; MABCD odd years12 hrs / 2 yrs (half code) — statutory floor
VERIFIED
October 2026Official sources
FILE · ELECTRICAL x KANSAS
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYNone for this trade
STATUTE / CODEK.S.A. 12-1525 to 12-1528
SCOPEStatewide · Kansas
RENEWALLocal — JoCo annual; MABCD odd years
CONTINUING ED.12 hrs / 2 yrs (half code) — statutory floor
LOCAL OFFICES3 counties on file
FILE ELECTRICALSCOPE STATEWIDE · KANSASTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe Kansas rules for electrical contractors, verified against official sources.
LICENSE TRUTH
Kansas issues no state electrical license — cities and counties license electricians, but state law forces them to use designated exams, a 75% passing score, and portable certificates.
STATE ↔ LOCAL
The state sets the exam, score, CE, and portability rules; cities and counties decide whether to license and issue the license, permits, and inspections. Johnson County issues the DE electrical license for its participating cities; MABCD issues an Electrical trade license plus master/journeyman trade certificates for Wichita and Sedgwick County; Lawrence licenses inside city limits. A 1999 Attorney General opinion (1999-42) concluded cities may not use home rule to add licensure requirements beyond the statute.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How electrical work is governed in Kansas.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — EXAM RULES
K.S.A. 12-1525 / 12-1526
ICC / IAPMO / PROMETRIC EXAM75% PASS12 CE HRS / 2 YRS
LOCAL — THE LICENSE
Johnson County · MABCD · Lawrence
ELECTRICAL CONTRACTOR LICENSEMASTER / JOURNEYMAN CERTIFICATE
LOCAL — THE JOB
City / county inspection
ELECTRICAL PERMITINSPECTIONS

Read it bottom-up.

The state sets the exam, score, CE, and portability rules; cities and counties decide whether to license and issue the license, permits, and inspections. Johnson County issues the DE electrical license for its participating cities; MABCD issues an Electrical trade license plus master/journeyman trade certificates for Wichita and Sedgwick County; Lawrence licenses inside city limits. A 1999 Attorney General opinion (1999-42) concluded cities may not use home rule to add licensure requirements beyond the statute.

The local offices section below names the exact permit desk for every Kansas county on file.

Source · State and local issuing authoritiesLast verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
State Electrical LicenseKansas issues none
—
$0
—
K.S.A. 12-1526 (local option)
OPTIONAL
Certificate of CompetencyDesignated exam at 75%; portable statewide among licensing jurisdictions
Licensing city / county
Uniform fee set locally + exam fee
Before local licensing
K.S.A. 12-1526(a)–(b)
CONDITIONAL
Local Electrical Contractor LicenseJohnson County DE; MABCD Electrical trade license
Johnson County / MABCD / Lawrence
Johnson County $100 + $225
JoCo annual; MABCD odd years
Local code
CONDITIONAL
Continuing Education12 hrs biennially or 6 annually; at least half code
Approved providers
Provider rate
Per renewal
K.S.A. 12-1526(a)
CONDITIONAL
Workers' CompensationRequired unless prior-year gross payroll was $20,000 or less (family wages excluded)
Carrier
By payroll
Before hiring
K.S.A. 44-505(a)(2)
CONDITIONAL
Electrical PermitPer local code
City / county
Set locally
Per project
K.S.A. 12-1527(b)–(c)
REQUIRED
§ 03 · Year-One Cost

What it costs to start electrical in Kansas.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Kansas · Electrical
State licenseNone exists$0
Johnson County DE license (first year)$100 application + $225$325
Designated examICC / IAPMO / PrometricProvider rate
Continuing education12 hours per 2 yearsProvider rate
Year-one floor$0 state · local license + exam
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
Take the designated exam

A local alternative exam produces a license valid only in that city or county. The designated ICC/IAPMO/Prometric exam produces a certificate every licensing Kansas jurisdiction must accept as proof of competency.

NOTE
The CE floor is statutory

Every licensing jurisdiction must require 12 hours every two years (or 6 a year), at least half code, and may not limit the number of approved providers.

NOTE
MABCD runs on odd years

Wichita/Sedgwick County trade licenses expire December 31 of odd years and renew with 12 approved CE hours, six of them code.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new electrical contractor in Kansas. Actual agency processing times are noted in the ledger above.

1
STEP 1
Log 2 years field experience
Under a certificate holder (≤1 yr schooling)
2
STEP 2
Pass the designated exam
ICC / IAPMO / Prometric · 75%
3
STEP 3
Journeyman → 2 years → master
Licensing jurisdiction
4
STEP 4
License the business locally
Johnson County · MABCD · Lawrence
5
STEP 5
Pull permits and pass inspections
City / county
6
STEP 6
12 CE hours per 2 years
Approved provider
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Use the designated exam
It's the only exam whose certificate is portable across Kansas licensing jurisdictions.
STATEPORTABILITYK.S.A. 12-1525; 12-1526(b)
ElectricianIssuing authority
02
Document field experience
Two years for journeyman/residential; two years as journeyman for master.
STATEELIGIBILITYK.S.A. 12-1526(e)–(f)
ElectricianIssuing authority
03
License in each jurisdiction you work
Johnson County, MABCD, and Lawrence each issue their own electrical licenses.
LOCALESSENTIALLocal code
Local licensing officeIssuing authority
04
Keep CE current
12 hours every two years, at least half code education.
RENEWALEDUCATIONK.S.A. 12-1526(a)
Approved providerIssuing authority
05
Carry workers' comp
Required once gross annual payroll exceeds $20,000.
INSURANCESTATEK.S.A. 44-505
CarrierIssuing authority
§ 06 · Enforcement

What the law does about unlicensed electrical work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
Local code (authorized by K.S.A. 12-1527 / 12-1558)Statute

Working without the local electrical license

Johnson County cities, MABCD (Wichita/Sedgwick County), and Lawrence condition permits on an active local license of the matching class; penalties are set by each local code, not by state statute.

ConsequencePermit refusal + local code penalties
§
K.S.A. 60-1102Statute

Lost lien rights

A lien statement on residential property must be filed within four months after the last labor or materials; commercial claims get five months only if a notice of extension is filed within the first four.

ConsequenceNo lien remedy after the deadline
§
K.S.A. 50-636(a)Statute

Deceptive or unconscionable consumer practices

Contractors selling to consumers are suppliers under the Kansas Consumer Protection Act; a court may impose civil penalties for each violation, up to $20,000 for willful violation of a court order.

ConsequenceUp to $10,000 per violation
§ 08 · Kansas FAQ

Questions electrical contractors ask about Kansas.

Q01Does Kansas have a state electrical license?+
No. Electricians are licensed by cities and counties. State law (K.S.A. 12-1525 to 12-1527) only governs how those localities test and whether their licenses carry over.
Q02Will my license transfer between Kansas cities?+
A certificate of competency from the designated ICC, IAPMO, or Prometric exam — plus the required experience — is valid proof in any Kansas city or county that licenses electricians, without retesting (K.S.A. 12-1526(b)). A license based on a local alternative exam is valid only locally unless the jurisdictions have a reciprocal agreement.
Q03How much experience do I need?+
Journeyman or residential: at least two years of documented field experience, no more than one of them by trade schooling of at least 930 hours. Master: at least two years holding a journeyman certificate (K.S.A. 12-1526(e)–(f)).
Q04What continuing education is required?+
Any licensing jurisdiction must require 12 hours every two years or 6 hours a year, with at least half in code education (K.S.A. 12-1526(a)).
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: Which Johnson County cities require the county contractor license — no official county page lists participating cities (Overland Park's requirement is documented in our Johnson County office record) · MABCD and Lawrence license fee amounts for this class (MABCD's licensing page lists no amounts; a 2024 MABCD application form was seen only as a search excerpt) · Attorney General Opinion 1999-42 is cited from the statute annotations; its full text was not read · Whether any Kansas jurisdiction exempts low-voltage work from electrical licensing (no statewide rule found)

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.