ELECTRICAL x OREGON

Electrical contractor requirements in Oregon.

ORS 479.620 makes it illegal to run an electrical installation business without an electrical contractor's license, to supervise installations without a supervising electrician's license, or to make installations without a supervising, journeyman, or limited residential electrician's license. BCD contractor licensees must also keep an active CCB license (OAR 918-030-0015).

The individual licenses are experience-gated: a general journeyman needs four years of apprentice-level experience including at least 1,000 hours wiring dwellings, and a general supervising electrician needs four years as a journeyman before the board exam. Even property owners may not let unlicensed people wire their buildings (ORS 479.620(6)).

STATE LICENSE
RequiredOregon Building Codes Division — Electric…
STATUTE
ORS 479.620; ORS 479.630
RENEWAL
CCB biennial · BCD per license cycleCCB residential 8–16 hrs / 2 yrs; electrician CE per BCD rule
VERIFIED
October 2026Official sources
FILE · ELECTRICAL x OREGON
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYOregon Building Codes Division — Electrical and Elevator Board (plus CCB)
STATUTE / CODEORS 479.620; ORS 479.630
SCOPEStatewide · Oregon
RENEWALCCB biennial · BCD per license cycle
CONTINUING ED.CCB residential 8–16 hrs / 2 yrs; electrician CE per BCD rule
LOCAL OFFICES5 counties on file
FILE ELECTRICALSCOPE STATEWIDE · OREGONTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe Oregon rules for electrical contractors, verified against official sources.
LICENSE TRUTH
Electrical contracting in Oregon takes two state licenses at once: a Construction Contractors Board license and a Building Codes Division electrical contractor license, with every installation made by licensed electricians.
STATE ↔ LOCAL
Electrical permits and inspections run through the city or county inspection program or BCD where no local program exists. Locals cannot add their own contractor license (ORS 701.325(6)), and a permit issues only to a properly licensed contractor.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How electrical work is governed in Oregon.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — CONSTRUCTION LICENSE
Construction Contractors Board
CCB LICENSEBOND + LIABILITY
STATE — ELECTRICAL LICENSES
BCD / Electrical and Elevator Board
ELECTRICAL CONTRACTOR (C)SUPERVISING ELECTRICIANJOURNEYMAN CARDS
LOCAL — PERMITS
City / county or BCD inspection
ELECTRICAL PERMITSINSPECTIONS

Read it bottom-up.

Electrical permits and inspections run through the city or county inspection program or BCD where no local program exists. Locals cannot add their own contractor license (ORS 701.325(6)), and a permit issues only to a properly licensed contractor.

The local offices section below names the exact permit desk for every Oregon county on file.

Source · Oregon Building Codes Division — Electrical and Elevator Board (plus CCB)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
CCB License — RSC or CSCBCD contractor licensees must keep an active CCB license
CCB
$400 / 2 yrs
Six to eight weeks
ORS 701.021
REQUIRED
Electrical Contractor License (C)Business license; designate a signing supervisor
BCD
$375
After CCB license
ORS 479.620(1)
REQUIRED
General Supervising ElectricianExam + 4 yrs as general journeyman
BCD / EEB
Per BCD fee schedule
Exam-based
ORS 479.630(2)
REQUIRED
Journeyman / Limited Residential LicenseEveryone making installations; 4 yrs incl. 1,000 hrs dwelling wiring for general journeyman
BCD / EEB
Per BCD fee schedule
Exam-based
ORS 479.620(3)
REQUIRED
CCB Surety BondAmount fixed by endorsement
Corporate surety
$20,000 RSC
With application
ORS 701.081
REQUIRED
General Liability InsuranceProof at licensure and every renewal
Private carrier
$300,000 RSC
With application
ORS 701.073
REQUIRED
Workers' CompensationNonexempt class — any employees or leased workers
Private carrier / SAIF
Premium by payroll
Before hiring
ORS 701.035
CONDITIONAL
Electrical PermitsPer installation; inspected by city, county, or BCD
Local inspection authority
By local fee schedule
Per project
ORS 701.325(1)
CONDITIONAL
§ 03 · Year-One Cost

What it costs to start electrical in Oregon.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Oregon · Electrical
CCB licenseTwo-year term$400
BCD electrical contractor licensePer BCD Form 440-2888$375
CCB examPer attempt$60
Individual electrician licensesSupervising + journeyman; BCD fee schedulePer license
Bond + liability insuranceCCB minimums by endorsementMarket premium
Year-one floor≈ $835 in CCB + BCD fees, plus individual licenses
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
Two agencies, one business

The CCB license is the prerequisite; the BCD electrical contractor license sits on top. Apply to CCB first — the BCD application asks for your CCB number and expiration.

NOTE
Owner exemption is narrow

Owners may wire their own residential or farm property not intended for sale, lease, or rent (ORS 479.540) — it never covers work for hire.

NOTE
Fines can run daily

BCD civil penalties reach $5,000 per offense, or $1,000 per day for a continuing offense (ORS 455.895(2)).

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new electrical contractor in Oregon. Actual agency processing times are noted in the ledger above.

1
STEP 1
Journeyman experience + exam
4 yrs; BCD exam
2
STEP 2
Supervising electrician exam
4 yrs as journeyman
3
STEP 3
CCB license
Training, exam, bond, insurance
4
STEP 4
BCD electrical contractor license
BCD — $375
5
STEP 5
Designate signing supervisor
BCD Form 440-2888
6
STEP 6
Pull electrical permits
Local inspection authority
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Hold both business licenses
CCB license plus the BCD electrical contractor license before advertising or making installations.
STATEESSENTIALORS 479.620(1)
CCB + BCDIssuing authority
02
Name a supervising electrician
No one may direct or supervise installations without a supervising electrician's license.
STATESUPERVISIONORS 479.620(2)
BCDIssuing authority
03
License every installer
Every person making installations holds a supervising, journeyman, or limited residential license; apprentices hold apprentice licenses.
STAFFINGESSENTIALORS 479.620(3)–(4)
BCDIssuing authority
04
Permit and inspect
Electrical permits issue only to properly licensed contractors and carry your license number.
PERMITLOCALORS 701.325(1)
Local officeIssuing authority
§ 06 · Enforcement

What the law does about unlicensed electrical work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
ORS 479.995; ORS 455.895(2)Statute

Unlicensed electrical work

Violations of the electrical licensing law (ORS 479.510–479.945) are subject to Electrical and Elevator Board civil penalties under ORS 455.895.

ConsequenceUp to $5,000/offense or $1,000/day
§
ORS 701.990(1)Statute

Unlicensed contracting

Undertaking, offering to undertake, or bidding construction work for compensation without a current CCB license violates ORS 701.021 — a crime, not just a licensing infraction.

ConsequenceClass A misdemeanor
§
ORS 701.131Statute

No lien, no lawsuit

A contractor that was not licensed and properly endorsed when it bid or contracted, and continuously while working, may not perfect a construction lien, file a CCB complaint, or sue or arbitrate for payment.

ConsequenceNo right to collect
§ 08 · Oregon FAQ

Questions electrical contractors ask about Oregon.

Q01Do electricians need a license in Oregon?+
Yes — at two levels. The business needs a CCB license and a BCD electrical contractor license; each person making installations needs a supervising, journeyman, or limited residential electrician license (ORS 479.620).
Q02How long does it take to become a journeyman electrician in Oregon?+
A general journeyman needs at least four years of apprentice-level experience, including at least 1,000 hours wiring single- or multifamily dwellings, plus the board exam (ORS 479.630(4)).
Q03Can a homeowner do their own electrical work?+
On residential or farm property they own that isn't intended for sale, lease, or rent — yes, with permits and inspections (ORS 479.540). It never extends to work for hire.
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: BCD contractor fee of $375 is from Form 440-2888 (revision 1/15); a newer fee schedule may apply · Individual electrician license fees, BCD license term, and electrician continuing-education hours (set by OAR chapter 918; not retrieved)

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.