FILE · CONCRETE x ARLINGTON x VIRGINIAPermit StackSpecs LedgerCostTimelineChecklistViolationsFAQ
CONCRETE x ARLINGTON x VIRGINIA

Concrete contractors in Arlington, Virginia.

Concrete contractors operating in Arlington, Virginia, must navigate a dual-layer regulatory environment involving state-level licensing through the Virginia DPOR and local-level permitting through Arlington County. Compliance is essential for maintaining legal standing and ensuring that projects meet the county's strict zoning and environmental standards, particularly regarding lot coverage and stormwater runoff.

Contractors are responsible for verifying that all work, from residential driveways to structural foundations, is permitted and inspected. Failure to adhere to these requirements can result in stop-work orders, fines, and potential liability issues. Always consult the Arlington County Inspection Services Division (ISD) before beginning any concrete project to confirm current code adoptions and site-specific requirements.

State License
STATE DPOR Class A/B/CRequired by VA
Permit Issuer
Arlington County ISDOnline Portal
Avg. Plan Review
5-10 DaysVaries by scope
Typical Start-Up
RANGE $500-$2,000Permits/Fees
FILE · CONCRETE x ARLINGTON x VIRGINIA
Compliance Dossier
Public
File
05 / 2026
State AuthorityVirginia DPOR
CountyArlington County
City AuthorityArlington Inspection Services
Statute / CodeUSBC / Arlington Zoning
Federal Cert.OSHA Compliance
ReciprocityVerify with DPOR
FILE CONCRETELOCATION ARLINGTON, VIRGINIATYPE COMPLIANCE GUIDE
VERIFIED 05 / 2026STATUS PUBLIC REFERENCE
What's specific to ArlingtonWhat this leaf carries beyond the Virginia state file.
Stormwater Sensitivity
Arlington has unique, strict requirements for impervious surface coverage to manage urban runoff.
Zoning Overlay Districts
Specific neighborhoods in Arlington may have additional design guidelines for exterior concrete work.
Digital Permitting
Arlington utilizes a robust online portal for permit submission and inspection tracking.
§ 01 · Permit Stack

Three layers govern Concrete work in Arlington.

State licensing provides the legal right to work, while county permits authorize the specific project scope.

State — Floor
Virginia DPOR
Contractor LicenseInsurance
County — Overlay
Arlington Zoning
Lot Coverage LimitsSetbacks
City — Where you file
Arlington ISD
Building PermitInspections

Read it bottom-up.

State licensing provides the legal right to work, while county permits authorize the specific project scope.

This file exists to show what changes when the trade is Concrete and the jurisdiction is Arlington, Virginia.

Source · State, county, and city issuing authoritiesLast verified · 05 / 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement.

RequirementIssued byCostTimeCitationStatus
DPOR Contractor LicenseRequired for all work
Virginia DPOR
Verify with DPOR
4-8 weeks
Code of VA 54.1
REQUIRED
General LiabilityMinimum coverage required
Private Carrier
Market rate
Immediate
Verify with DPOR
REQUIRED
Building PermitFor all concrete flatwork
Arlington ISD
Verify with ISD
5-10 days
Arlington Code
REQUIRED
Surety BondMay be required for specific permits
Surety
Verify with County
1 week
Verify with County
REQUIRED
OSHA 10Recommended for safety
OSHA
Varies
2 days
Federal Law
REQUIRED
Erosion ControlFor large projects
DES
Verify with DES
Varies
Arlington Ordinance
REQUIRED
§ 03 · Year-One Cost

What it costs to start Concrete in Arlington.

A practical floor for Arlington, Virginia. Verify each amount with the issuing authority.

Year-one ledger
Arlington, Virginia · Concrete
DPOR License FeeInitial applicationVerify with DPOR
Building PermitBased on project costVerify with ISD
Plan Review FeeIf requiredVerify with ISD
Liability InsuranceAnnual premiumMarket rate
Workers' CompAnnual premiumMarket rate
Erosion Control PermitIf applicableVerify with DES
Year-one floorVariable
Excludes tools, vehicle purchase, payroll, and marketing.
Note
Permit Fees

Fees are calculated based on the total valuation of the construction work.

Note
Insurance

Costs fluctuate based on company size and history.

Note
Updates

Always check the Arlington County fee schedule annually.

§ 04 · Path to First Job

From day zero to first inspection.

A practical path for Concrete contractors in Arlington.

1
Day 0
License Verification
DPOR
2
Day 5
Site Plan Preparation
Contractor
3
Day 10
Permit Application
Arlington ISD
4
Day 20
Permit Approval
Arlington ISD
5
Day 25
Pre-Pour Inspection
Arlington ISD
6
Day 30
Final Inspection
Arlington ISD
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Verify DPOR License
Ensure license is active and in good standing.
LegalStateDPOR
ContractorIssuing authority
02
Check Zoning
Confirm project meets lot coverage limits.
ZoningCountyArlington Zoning
ContractorIssuing authority
03
Submit Permit
File application via online portal.
PermitISDArlington ISD
ContractorIssuing authority
04
Post Permit
Display permit clearly at the site.
ComplianceSiteArlington Code
ContractorIssuing authority
05
Call for Inspection
Request inspection 24 hours in advance.
InspectionISDArlington ISD
ContractorIssuing authority
06
Final Sign-off
Obtain final inspection approval.
CloseoutLegalArlington ISD
ContractorIssuing authority
§ 06 · Local Enforcement Data

Violations cited most in Arlington.

When confirmed local data is unavailable, this section stays marked for verification.

Commonly cited
Verify with agency

Unpermitted Work

Performing concrete work without a valid building permit.

PenaltyStop-work order/Fines
Commonly cited
Verify with agency

Setback Violations

Constructing concrete pads too close to property lines.

PenaltyRemoval/Correction
Commonly cited
Verify with agency

Runoff Violations

Failing to manage sediment during concrete pouring.

PenaltyEnvironmental fines
§ 07 · Arlington-specific FAQ

Questions Concrete contractors ask about Arlington.

Q01Do I need a license for small concrete repairs?+
Yes, Virginia requires a DPOR license for any construction work, though the class of license depends on the total contract value. Verify with DPOR.
DPORLicensingSource · Code of Virginia § 54.1-1100
Q02Is a permit required for a concrete patio?+
Yes, Arlington County requires a building permit for most exterior concrete flatwork that alters drainage or lot coverage. Verify with Arlington ISD.
PermitArlington ISDSource · Arlington County Building Code
Q03What is the role of the erosion and sediment control plan?+
Concrete projects must prevent runoff from entering storm drains, which is strictly enforced in Arlington. Verify with Department of Environmental Services.
ErosionEnvironmentSource · Arlington County Zoning Ordinance
Q04Are there specific setbacks for concrete driveways?+
Yes, Arlington County has strict zoning setbacks for all permanent structures, including driveways and walkways. Verify with Zoning Division.
ZoningSetbacksSource · Arlington County Zoning Ordinance
Q05Do I need workers' compensation insurance?+
Yes, Virginia law requires employers with two or more employees to carry workers' compensation insurance. Verify with Virginia Workers' Compensation Commission.
InsuranceLegalSource · Code of Virginia § 65.2-800
Q06How do I schedule an inspection?+
Inspections are scheduled through the Arlington County online portal or the IVR system after the permit is issued. Verify with ISD.
InspectionProcessSource · Arlington County Inspection Services
§ 08 · Related

Adjacent files.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.