HomeAlabamaGeneral Contracting
GENERAL CONTRACTING x ALABAMA

General Contracting contractor requirements in Alabama.

Alabama runs two separate general-contracting regimes. The Licensing Board for General Contractors (Code of Ala. § 34-8) covers any building, highway, sewer, site work, paving, or other improvement where the cost of the undertaking is $100,000 or more — Act 2024-277 raised that floor from $50,000 effective October 1, 2024 — but § 34-8-7(a)(2) exempts the construction or repair of any residence or private dwelling. Residences belong to the Home Builders Licensure Board (§ 34-14A), whose license is triggered once a residential undertaking exceeds $10,000.

The commercial license is financial as much as technical. The board assigns each licensee a bid-limit letter — A (up to $100,000) through E (up to $3,000,000), or U for unlimited — set at no more than 10 times the lesser of net worth or working capital on a CPA-prepared financial statement, with a $10,000 minimum for both. Subcontractors working under a general contractor on $100,000+ undertakings need their own license from the same board, at half the fee, with no exam and no bid limit.

Act 2026-396, effective October 1, 2026, added new exemptions to § 34-8-7, including residential swimming pools and certain routine maintenance, repair, cleaning, and facility-support work. The board says the act does not define every routine-maintenance situation and asks contractors to raise specific projects with the board before bidding or starting work.

STATE LICENSE
ConditionalAlabama Licensing Board for General Contr…
STATUTE
Code of Ala. § 34-8-1 et seq.; § 34-14A-1 et seq.
RENEWAL
Residential: calendar-year license, renew by Nov 30 · Commercial: 12-month staggeredResidential (HBLB): 6 hrs/yr, 2 Alabama-specific
VERIFIED
October 2026Official sources
FILE · GENERAL CONTRACTING x ALABAMA
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYAlabama Licensing Board for General Contractors (commercial) · Home Builders Licensure Board (residential)
STATUTE / CODECode of Ala. § 34-8-1 et seq.; § 34-14A-1 et seq.
SCOPEStatewide · Alabama
RENEWALResidential: calendar-year license, renew by Nov 30 · Commercial: 12-month staggered
CONTINUING ED.Residential (HBLB): 6 hrs/yr, 2 Alabama-specific
LOCAL OFFICES5 counties on file
FILE GENERAL CONTRACTINGSCOPE STATEWIDE · ALABAMATYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe Alabama rules for general contracting contractors, verified against official sources.
LICENSE TRUTH
Alabama splits general contracting by project type: commercial and industrial undertakings of $100,000 or more need a Licensing Board for General Contractors license, while residential work over $10,000 needs a Home Builders Licensure Board license instead.
STATE ↔ LOCAL
Permit desks enforce the state split. Under Code of Ala. § 34-14A-13, a city or county building official must refuse a permit for residential work that requires a Home Builders license unless the applicant shows the license or an exemption, and under § 34-8-9 must see a General Contractors Board license or exemption before issuing commercial permits — that permit statute still reads $50,000, and the Huntsville and Mobile contractor pages still quote $50,000, even though the licensing threshold in § 34-8-1 has been $100,000 since October 1, 2024. State licensure never replaces the local business license: municipalities levy their own under § 11-51-90 et seq., which classifies construction trades (NAICS 236–238) on gross receipts and/or a flat rate. Huntsville requires every contractor and subcontractor to hold a current city privilege license and contractor's liability insurance before construction, and requires a building permit when labor and materials exceed $250 or any structural work is involved. The same statutory permit-desk checks bind Birmingham's and Montgomery's building officials.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How general contracting work is governed in Alabama.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — COMMERCIAL ($100K+)
Licensing Board for General Contractors
PRIME LICENSEBID-LIMIT LETTERCPA FINANCIALS
STATE — RESIDENTIAL (OVER $10K)
Home Builders Licensure Board
UNLIMITED OR LIMITED LICENSEINSURANCE DISCLOSURE6 HRS CE
LOCAL — WHERE YOU WORK
City / county permit desk
MUNICIPAL BUSINESS LICENSEPERMIT LICENSE CHECK

Read it bottom-up.

Permit desks enforce the state split. Under Code of Ala. § 34-14A-13, a city or county building official must refuse a permit for residential work that requires a Home Builders license unless the applicant shows the license or an exemption, and under § 34-8-9 must see a General Contractors Board license or exemption before issuing commercial permits — that permit statute still reads $50,000, and the Huntsville and Mobile contractor pages still quote $50,000, even though the licensing threshold in § 34-8-1 has been $100,000 since October 1, 2024. State licensure never replaces the local business license: municipalities levy their own under § 11-51-90 et seq., which classifies construction trades (NAICS 236–238) on gross receipts and/or a flat rate. Huntsville requires every contractor and subcontractor to hold a current city privilege license and contractor's liability insurance before construction, and requires a building permit when labor and materials exceed $250 or any structural work is involved. The same statutory permit-desk checks bind Birmingham's and Montgomery's building officials.

The local offices section below names the exact permit desk for every Alabama county on file.

Source · Alabama Licensing Board for General Contractors (commercial) · Home Builders Licensure Board (residential)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
Prime Contractor LicenseCommercial/industrial undertakings of $100,000 or more
AL GC Licensing Board
$300 application
File 30+ days before a board meeting
Code of Ala. § 34-8-2(a)
CONDITIONAL
Residential Home Builder LicenseResidential undertakings over $10,000
Home Builders Licensure Board
$235/yr + $100 processing + $15 recovery fund
Calendar-year license
Code of Ala. § 34-14A-5; Rule 465-X-4-.04
CONDITIONAL
CPA Financial StatementAudited, reviewed, or compiled; ≤1 year old; sets the bid limit
CPA / GC Board
$10,000 min. net worth & working capital
With application and renewals
Code of Ala. § 34-8-2(a)
CONDITIONAL
Liability Insurance (commercial)Proof required with application; board named as certificate holder
Private carrier
Amount not set in statute
With application
Code of Ala. § 34-8-2(a)
CONDITIONAL
Insurance Disclosure (residential)Tell the homeowner in writing whether you carry liability insurance
You → homeowner
$0
Before work begins
Code of Ala. § 34-14A-19
CONDITIONAL
Workers' Compensation5+ employees — or any headcount if building new single-family detached homes
Private carrier
Premium by payroll
Before hiring
Code of Ala. § 25-5-50(a)
CONDITIONAL
Municipal Business LicenseEach municipality where you do business
City
Gross receipts and/or flat rate
Annual
Code of Ala. § 11-51-90.2
REQUIRED
§ 03 · Year-One Cost

What it costs to start general contracting in Alabama.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Alabama · General Contracting
Prime applicationNonrefundable; cashier's check or money order$300
Prime renewalAnnual; $50 penalty if renewed 90+ days late$200
Subcontractor application / renewalHalf the prime fees (§ 34-8-7(b)(1))$150 / $100
HBLB license (unlimited or limited)Annual$235
HBLB application processingNonrefundable, new applicants$100
HBLB Homeowners' Recovery FundAnnual, with license$15
Exam vendor feesPSI (commercial) / Prov (residential) — paid to vendorNot published by boards
Year-one floor$300 commercial · $350 residential (first-year state fees)
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
The floor moved in 2024

Act 2024-277 raised the commercial licensing threshold from $50,000 to $100,000 effective October 1, 2024. Old guides — and some city pages — still say $50,000.

NOTE
Your financials set your ceiling

Bid limits: A ≤ $100,000 · B ≤ $250,000 · C ≤ $500,000 · D ≤ $1,000,000 · E ≤ $3,000,000 · U unlimited — at most 10× the lesser of net worth or working capital.

NOTE
Pre-1992 GC licenses can build homes

GC license numbers 1 through 18907, issued before the HBLB existed, may do residential work; anyone numbered 18908 or higher needs a separate Home Builders license.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new general contracting contractor in Alabama. Actual agency processing times are noted in the ledger above.

1
STEP 1
Commercial $100K+ or residential over $10K?
GC Board vs. HBLB
2
STEP 2
Register entity; get CPA financial statement
AL Secretary of State / CPA
3
STEP 3
File application 30+ days before a meeting
GC Board — $300
4
STEP 4
Pass Business & Project Management + trade exams
PSI
5
STEP 5
License issued with classification and bid limit
GC Board
6
STEP 6
Municipal business license, then permits
City / county
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Size the undertaking first
Commercial: $100,000 or more including labor and materials. Residential: over $10,000 including materials, labor, supervision, overhead, and profit.
STATESCOPECode of Ala. §§ 34-8-1, 34-14A-2
YouIssuing authority
02
Meet the $10,000 financial floor
Minimum net worth and working capital of $10,000 on a CPA-prepared statement; no deficits, no tax-basis statements.
STATEFINANCIALPrime Application Instructions
GC BoardIssuing authority
03
Put your license number on every bid
Licensees must include the license number in all contracts, subcontracts, bids, and proposals; owners must reject bids without it.
LEGALESSENTIALCode of Ala. §§ 34-8-6(b), 34-8-8(b)
GC BoardIssuing authority
04
Disclose insurance to homeowners
Residential builders must state in writing whether they carry liability insurance; a 'no' disclosure needs a witness chosen by the homeowner.
RESIDENTIALINSURANCECode of Ala. § 34-14A-19
HBLBIssuing authority
05
Check new exemptions before bidding
Act 2026-396 exempts residential pools and certain routine maintenance from the GC board as of October 1, 2026 — the board asks for project-specific questions before work starts.
2026 CHANGESCOPECode of Ala. § 34-8-7
GC BoardIssuing authority
06
Renew on time
Commercial licenses run 12 months from issuance; HBLB renewals are due November 30 for the next calendar year.
RENEWALDEADLINECode of Ala. § 34-8-2(b); Rule 465-X-3-.06
GC Board / HBLBIssuing authority
§ 06 · Enforcement

What the law does about unlicensed general contracting work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
Code of Ala. § 34-8-6(a); §§ 13A-5-7, 13A-5-12Statute

Unlicensed general contracting

Engaging in general contracting without a license, or using an expired or revoked license, is a Class A misdemeanor for each offense.

ConsequenceUp to 1 year and $6,000 per offense
§
Code of Ala. §§ 34-8-4(a), 34-8-6(c)Statute

Administrative fines and injunctions

The board may fine any violation and may seek an injunction with an additional fine plus costs and attorney fees; a contractor who fails to stop work can be barred from applying for up to one year.

Consequence$500–$5,000 per violation; up to $5,000 per offense in injunction suits
§
Code of Ala. § 34-14A-14Statute

Unlicensed residential building

An unlicensed residential home builder cannot sue to enforce the contract, commits a Class A misdemeanor, and faces HBLB fines.

ConsequenceContract unenforceable; fines up to $5,000 per violation
§ 08 · Alabama FAQ

Questions general contracting contractors ask about Alabama.

Q01What dollar amount requires a general contractor license in Alabama?+
For commercial and industrial work, $100,000 or more including labor and materials (Code of Ala. § 34-8-1, as amended by Act 2024-277 effective October 1, 2024). Residences are exempt from that board; residential work needs a Home Builders Licensure Board license once the undertaking exceeds $10,000.
Q02Can a commercial general contractor build houses?+
Only if the GC license number is 1 through 18907 (issued before the HBLB was created in 1992). Anyone with license number 18908 or higher must also hold a Home Builders license for residential construction.
Q03How is my bid limit set?+
By the board, at no more than 10 times the lesser of your net worth or working capital on your latest CPA-prepared financial statement, expressed as letter A ($100,000) through E ($3,000,000) or U (unlimited).
Q04Do subcontractors need a license?+
Yes, when working under a general contractor on an undertaking of $100,000 or more. Subcontractors pay half the fees, take no exam, have no bid limit, and may bid before licensure but cannot start work until licensed (§ 34-8-7(b)).
Q05Does Alabama reciprocate?+
The board lists reciprocity with the Arkansas, Louisiana, Mississippi, and Tennessee general contractor boards and the North Carolina State Board of Electrical Contractors, for licensees in good standing for one year in the same classification with the same qualifying party.
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: PSI and Prov exam fees (paid to the vendors; not published on either board's site) · Minimum liability-insurance amount for the GC Board license — § 34-8-2 requires proof of insurance but sets no figure, and the board's 230-X rules were not reviewed · Whether the GC Board's administrative rules impose any continuing-education requirement (none appears in § 34-8-2) · Birmingham's and Montgomery's own contractor registration and business-license procedures · Whether the § 34-8-9 permit-desk figure ($50,000) will be conformed to the $100,000 licensing threshold

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.