HomeMontanaElectrical
ELECTRICAL x MONTANA

Electrical contractor requirements in Montana.

Under MCA 37-68-301 no one may work as or hold out as an electrician or electrical contractor without a Department of Labor & Industry license. An electrical contractor must have one responsible licensed electrician: a master electrician makes it an unlimited contractor (residential, commercial, industrial, institutional), while a journeyman may be the responsible electrician only for a limited residential contractor serving structures of fewer than five living units. Individual electricians must work for a licensed electrical contractor.

A journeyman license requires a completed apprenticeship or 8,000 hours of legally obtained experience and a PSI exam passed at 70%; a residential electrician needs a residential apprenticeship or 4,000 residential hours; a master needs four years as a licensed journeyman and a 75% exam score. Every electrician completes 16 hours of NEC code education per two-year cycle. Owners wiring their own property and work at 90 volts or less are exempt.

STATE LICENSE
RequiredMontana State Electrical Board (Departmen…
STATUTE
MCA 37-68-301, 37-68-103, 37-68-305; ARM 24.141
RENEWAL
2 years — expires July 15, even years16 hrs NEC code education / 2-yr cycle
VERIFIED
October 2026Official sources
FILE · ELECTRICAL x MONTANA
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYMontana State Electrical Board (Department of Labor & Industry)
STATUTE / CODEMCA 37-68-301, 37-68-103, 37-68-305; ARM 24.141
SCOPEStatewide · Montana
RENEWAL2 years — expires July 15, even years
CONTINUING ED.16 hrs NEC code education / 2-yr cycle
LOCAL OFFICES3 counties on file
FILE ELECTRICALSCOPE STATEWIDE · MONTANATYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe Montana rules for electrical contractors, verified against official sources.
LICENSE TRUTH
Montana's State Electrical Board licenses both the business (electrical contractor, $210 application) and every electrician — master, journeyman, or residential — with licenses expiring July 15 of even-numbered years.
STATE ↔ LOCAL
Electrical licensing is state-only. Local governments certified by DLI's Building Codes Program may enforce the electrical code and issue permits within their area; elsewhere the state program permits and inspects.
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How electrical work is governed in Montana.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — THE LICENSES
State Electrical Board (MCA 37-68)
ELECTRICAL CONTRACTORRESPONSIBLE ELECTRICIANLICENSED ELECTRICIANS
STATE — EMPLOYER LAW
DLI Employment Standards
WORKERS' COMP + UI OR ICEC
LOCAL — WHERE YOU WIRE
Certified city/county or state Building Codes Program
ELECTRICAL PERMITINSPECTIONS

Read it bottom-up.

Electrical licensing is state-only. Local governments certified by DLI's Building Codes Program may enforce the electrical code and issue permits within their area; elsewhere the state program permits and inspects.

The local offices section below names the exact permit desk for every Montana county on file.

Source · Montana State Electrical Board (Department of Labor & Industry)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
Electrical Contractor LicenseOne responsible master (or journeyman for limited residential)
State Electrical Board
$210 application
Expires July 15, even years
MCA 37-68-301, 37-68-103(4); ARM 24.141.405
REQUIRED
Master Electrician4 yrs licensed journeyman; 75% exam
State Electrical Board
Per ARM 24.141.405
2-year cycle
MCA 37-68-304; ARM 24.141.515
CONDITIONAL
Journeyman or Residential ElectricianApprenticeship, or 8,000 hrs (journeyman) / 4,000 hrs (residential)
State Electrical Board
Per ARM 24.141.405
2-year cycle
MCA 37-68-305
REQUIRED
PSI Licensing ExamOpen book; 70% journeyman, 75% master
PSI
Vendor rate
After board approval
ARM 24.141.503
REQUIRED
16 Hours NEC Code EducationBy July 15 renewal deadline; new apprenticeship grads exempt first cycle
Board-approved provider
Provider rate
Per 2-year cycle
ARM 24.141.2102
REQUIRED
Workers' Comp + Unemployment Insurance, or ICECProof required for the contractor license
Carrier / DLI
Premium by payroll
Before licensure
ARM 24.141.505; MCA 39-71-401
REQUIRED
Electrical PermitCertified local jurisdiction or state Building Codes Program
City / county or DLI
Set by jurisdiction
Per project
DLI Building Codes Program
CONDITIONAL
§ 03 · Year-One Cost

What it costs to start electrical in Montana.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Montana · Electrical
Electrical contractor applicationPer the board's contractor application$210
Individual electrician licenseFee schedule in ARM 24.141.405Per ARM 24.141.405
PSI examPaid to PSI after board approvalVendor rate
16 hours code CEPer two-year cycleProvider rate
Year-one floor$210 contractor application + individual license and exam fees
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
One responsible electrician

Only one electrical licensee may be the electrician responsible for a licensed electrical contractor, and that licensee's level sets the contractor's scope.

NOTE
2026 renewal fees halved

The board abated renewal fees 50% for the 2026 renewal cycle (deadline July 15, 2026).

NOTE
No CCL needed

Licensed electricians working within their license are exempt from the Construction Contractor License (MCA 37-45-104(16)).

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new electrical contractor in Montana. Actual agency processing times are noted in the ledger above.

1
STEP 1
Registered apprenticeship
DLI apprenticeship / approved program
2
STEP 2
Board approval + PSI journeyman exam
State Electrical Board / PSI
3
STEP 3
4 years licensed journeyman → master
State Electrical Board
4
STEP 4
Electrical contractor license
State Electrical Board — $210
5
STEP 5
16 CE hours; renew by July 15 (even years)
Board-approved provider
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
License the shop
Hold an electrical contractor license with one responsible master (or journeyman, for limited residential).
STATEESSENTIALMCA 37-68-301; 37-68-103(4)
State Electrical BoardIssuing authority
02
License every electrician
Individuals must hold their own license and work for a licensed electrical contractor; apprentices work under a licensed electrician.
STATESTAFFINGMCA 37-68-301; 37-68-103(7)
State Electrical BoardIssuing authority
03
Carry the license on the job
Licensees must carry the license at all times while doing work that requires it.
STATEJOBSITEMCA 37-68-301(2)
Each electricianIssuing authority
04
Finish 16 hours of code CE
NEC code education on the currently adopted code, due by July 15 of even years.
RENEWALEDUCATIONARM 24.141.2102
Board-approved providerIssuing authority
§ 06 · Enforcement

What the law does about unlicensed electrical work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
MCA 37-1-109Statute

Unlicensed electrical work

DLI may order anyone working without the required license to cease and desist and seek an injunction; officers who knowingly participate are personally liable.

ConsequenceUp to $1,000 per day the order is violated; knowing injunction violation is a felony
§
MCA 37-68-316Statute

Failure to display license

Electricians who cannot show a license or proof of licensure on the job may be cited; each day is a separate offense.

Consequence$100 first, $250 second, $500 third and later offenses
§ 08 · Montana FAQ

Questions electrical contractors ask about Montana.

Q01Do I need a license to do electrical work in Montana?+
Yes. The business needs an electrical contractor license and each worker an individual electrician license from the State Electrical Board (MCA 37-68-301). Exemptions include work on your own property for your own use, apprentices under a licensed electrician, and work at 90 volts or less (MCA 37-68-103).
Q02Can a journeyman run an electrical contracting business?+
Only a limited one: a journeyman may be the responsible electrician for an electrical contractor doing residential construction of fewer than five living units in a single structure (MCA 37-68-103(4)). Unlimited work requires a master.
Q03When do Montana electrical licenses expire?+
July 15 of even-numbered years, for both electricians and electrical contractors; renewal opens 60 days earlier and requires 16 hours of NEC code education.
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: Individual master, journeyman, and residential electrician license and renewal fees (ARM 24.141.405 not retrieved) · Whether the $210 electrical contractor application fee is current — it comes from the board's application form revised July 2024 · Journeyman experience path: the board's page says apprenticeship completion is required, while MCA 37-68-305(1) also lists 8,000 hours of legally obtained experience and a 20,000-hour maintenance route; how the board applies the non-apprenticeship routes was not confirmed · MCA 37-68-304 (master electrician qualifications) was not read directly; master requirements come from the board's license page

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.