Under the Electrical License Act it is a misdemeanor to perform journeyman electrical work without a journeyman or contractor license, or to act as or advertise as an electrical contractor unless the person or an officer of the firm holds a contractor license (59 O.S. § 1690). Licenses are issued for no longer than one year and expire on the last day of the licensee's birth month (§ 1688). Active contractors must carry a $5,000 surety bond and $50,000 general liability (OAC 158:40-5-5).
Two recent laws changed the trade. HB 3215 (2024) cut the exam passing score from 75% to 70% with a 30-day retest wait (§ 1684). And as of January 1, 2026, journeymen and contractors must log 12 hours of continuing education every 36 months — six on OUBCC-adopted codes — while apprentices need 3 hours a year (§ 1688.1, as amended by HB 2084 in 2025).
The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.
Licensing is statewide through CIB, but cities may require a permit for all electrical work and appoint inspectors (59 O.S. § 1693). A political subdivision that has adopted a national electrical code and appointed an inspector has jurisdiction over code interpretation and installations there (§ 1689(E)); in incorporated areas without one, contractors must notify CIB before installing (§ 1689(G)). The homeowner exemption yields to local ordinance (§ 1692(B)).
The local offices section below names the exact permit desk for every Oklahoma county on file.
Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.
Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.
Licenses run no longer than one year and expire the last day of your birth month; renewing more than 30 days late adds a late fee.
From January 1, 2026: 12 hours every 36 months for journeymen and contractors, 3 hours a year for apprentices.
If the bond or liability coverage lapses, the contractor license goes inactive; inactive contractors may work only as journeymen.
A practical sequence for a new electrical contractor in Oklahoma. Actual agency processing times are noted in the ledger above.
Each item names the issuing authority, cycle, and citation.
Statutory consequences with their citations — not estimates, not “commonly cited” guesses.
Violating the Electrical License Act or a city ordinance enacted under it is a misdemeanor, in addition to possible suspension or revocation.
After a hearing, the Electrical Hearing Board may fine each violation; each day may be a separate violation.
Contracting without an active license, or using unlicensed workers, is cited per person.
Inside city limits, the city office listed here issues the permit; the county office serves unincorporated areas. Every office links to its official page.
Every fact in this file was checked against these official sources on October 2026.
Pending verification: A CIB continuing-education application form was reported to describe the electrical requirement as 3 hours every 12 months; 59 O.S. § 1688.1 as amended by HB 2084 (2025) sets 12 hours every 36 months, which this record follows · Whether OAC 158:40 continuing-education and fee text has been re-promulgated to match the 2025 statute (the rule copy retrieved predates HB 2084) · Exam fee charged by the testing vendor (set by contract under 59 O.S. § 1000.5; not published on the CIB page) · Whether Oklahoma City or Tulsa require their own contractor license or registration for this trade before issuing permits (CIB warns local jurisdictions may have their own licensing, registration, and permitting; city codes were not retrieved)
General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.