FRAMING x WYOMING

Framing contractor requirements in Wyoming.

No Wyoming statute licenses framers or carpentry contractors. Where a city or county licenses contractors, W.S. 16-6-1101 requires it to recognize another Wyoming jurisdiction's active license on proof of a passing ICC or equivalent exam. Framing inspections and building permits come from jurisdictions holding delegated code authority from the State Fire Marshal (W.S. 35-9-121).

Framing is construction and so extrahazardous employment in Wyoming: a framing business with employees needs a workers' compensation statement of coverage before it starts work (W.S. 27-14-108, 27-14-207). A framing subcontractor keeps lien rights only by sending the owner a preliminary notice within 30 days of first work, copied to the contractor that hired it (W.S. 29-2-112).

STATE LICENSE
NoneSee what applies
STATUTE
No trade statute
RENEWAL
No state license to renew; local licenses renew on the issuing jurisdiction's cycleNone at the state level for this trade
VERIFIED
October 2026Official sources
FILE · FRAMING x WYOMING
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYNone for this trade
STATUTE / CODESee ledger
SCOPEStatewide · Wyoming
RENEWALNo state license to renew; local licenses renew on the issuing jurisdiction's cycle
CONTINUING ED.None at the state level for this trade
LOCAL OFFICES1 counties on file
FILE FRAMINGSCOPE STATEWIDE · WYOMINGTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe Wyoming rules for framing contractors, verified against official sources.
LICENSE TRUTH
Wyoming has no state framing or carpentry license — framers work under local contractor licensing where it exists, frame to locally permitted plans, and carry workers' comp for employees.
STATE ↔ LOCAL
Wyoming has no statewide license for this trade, so contractor licensing is local. Cities, towns, and counties that license contractors set their own classes, exams, and bonds, but W.S. 16-6-1101 requires each of them to recognize an active, good-standing license issued by another Wyoming jurisdiction when the contractor shows a passing International Code Council (or equivalent) exam — with no retesting, though the accepting jurisdiction may require its own proof of financial assurance. Building codes are enforced by municipalities and counties that have taken delegated authority from the State Fire Marshal (W.S. 35-9-121), and any electrical work stays with state-licensed electrical contractors (W.S. 35-9-123).
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How framing work is governed in Wyoming.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — NO TRADE LICENSE
Wyoming Statutes (Titles 27, 29)
NO STATE LICENSEWORKERS' COMPPRELIMINARY LIEN NOTICE
STATE — LIEN LAW
W.S. 29-2-106 to 29-2-113
SUB NOTICE WITHIN 30 DAYS20-DAY NOTICE OF INTENT
LOCAL — WHERE YOU WORK
City / county (W.S. 16-6-1101, 35-9-121)
LOCAL CONTRACTOR LICENSEBUILDING PERMITINSPECTIONS

Read it bottom-up.

Wyoming has no statewide license for this trade, so contractor licensing is local. Cities, towns, and counties that license contractors set their own classes, exams, and bonds, but W.S. 16-6-1101 requires each of them to recognize an active, good-standing license issued by another Wyoming jurisdiction when the contractor shows a passing International Code Council (or equivalent) exam — with no retesting, though the accepting jurisdiction may require its own proof of financial assurance. Building codes are enforced by municipalities and counties that have taken delegated authority from the State Fire Marshal (W.S. 35-9-121), and any electrical work stays with state-licensed electrical contractors (W.S. 35-9-123).

The local offices section below names the exact permit desk for every Wyoming county on file.

Source · State and local issuing authoritiesLast verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
Local Contractor LicenseWhere the city or county licenses contractors; other Wyoming jurisdictions must recognize it with ICC exam proof
City / county
Set locally
Before bidding in that jurisdiction
W.S. 16-6-1101(b)
CONDITIONAL
Workers' Compensation CoverageConstruction (NAICS sector 23) is extrahazardous employment. Employers must apply and receive a statement of coverage before starting work
Wyoming Department of Workforce Services
By payroll
Before starting work
W.S. 27-14-108(a)(ii)(D); 27-14-207(a)
CONDITIONAL
Preliminary Lien NoticeNotice of lien rights to the record owner before any payment (subs: within 30 days of first work); missing it bars your lien
You
$0
Before first payment
W.S. 29-2-112(a)
REQUIRED
Building Permit + InspectionsFrom the city or county where it holds delegated code authority
City / county building official
Set locally
Per project
W.S. 35-9-121
CONDITIONAL
Licensed Electrical Contractor for any wiringAll electrical equipment is installed by licensed electrical contractors; owner-occupant and farm exemptions do not cover contractors
DFPES
Electrician's rate
Per job
W.S. 35-9-123(a)–(b)
CONDITIONAL
§ 03 · Year-One Cost

What it costs to start framing in Wyoming.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
Wyoming · Framing
State trade licenseWyoming issues none for this trade$0
Local contractor licenseOnly where the city or county requires oneSet locally
Workers' compensationState coverage through DWS for employersBy payroll
General liabilityNo state minimum for this tradeMarket premium
Year-one floor$0 state + local license fees
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
No state license

Wyoming issues no state license for this trade; the license you need, if any, comes from the city or county where the job is.

NOTE
Keep your ICC exam proof

Another Wyoming jurisdiction must recognize your local license without retesting if you show a passing ICC or equivalent exam (W.S. 16-6-1101(b)(ii)).

NOTE
Ask the GC for owner details

The contractor must give subs the record owner's name and address and the site's legal description at contracting (W.S. 29-2-113) — you need them for your notice.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new framing contractor in Wyoming. Actual agency processing times are noted in the ledger above.

1
STEP 1
Form the business entity + EIN
Wyoming Secretary of State / IRS
2
STEP 2
Workers' comp statement of coverage
Department of Workforce Services
3
STEP 3
Local framing / contractor license where required
City / county
4
STEP 4
Preliminary lien notice before first payment
To the record owner
5
STEP 5
Pull permits + schedule inspections
City / county building
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Check each city's license
Licensing is local; ask every city or county you work in, and carry ICC exam proof so another Wyoming jurisdiction's license is recognized without retesting.
LOCALESSENTIALW.S. 16-6-1101(b)
City / countyIssuing authority
02
Cover workers before work starts
An employer in extrahazardous employment may not commence work in Wyoming without applying for coverage and receiving a statement of coverage.
STATEINSURANCEW.S. 27-14-207(a)
DWSIssuing authority
03
Send the lien notice first
Prime contractors send the preliminary notice before receiving any payment, including advances; subs within 30 days of first work. Late notice bars the lien.
STATELIEN RIGHTSW.S. 29-2-112(a)(ii)–(iii)
YouIssuing authority
04
Sub out the wiring
Electrical installations must be made by a licensed electrical contractor; the owner-occupant exemption never covers a contractor working for that owner.
SCOPESPLIT RULEW.S. 35-9-123(a)–(b)
Licensed electricianIssuing authority
§ 06 · Enforcement

What the law does about unlicensed framing work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
W.S. 29-2-112(a)(iii)Statute

No preliminary notice, no lien

A contractor, subcontractor, or materialman who does not send the preliminary notice within the time required loses the right to assert a construction lien.

ConsequenceLien rights barred
§
W.S. 27-14-203(a), (c)Statute

Uninsured employer

An employer that does not apply for coverage is liable to the state for every award paid and reserved for an injured employee; unpaid premiums carry interest.

ConsequenceLiability for all awards + 1% per month interest
§
W.S. 35-9-130(c)Statute

Unlicensed electrical work

Installing electrical equipment without being, or employing, a licensed electrical contractor violates the electrical act.

ConsequenceCivil penalty up to $500 first offense, $1,000 for a repeat within 3 months
§ 07 · Local Offices

Where the permit is filed, county by county.

Inside city limits, the city office listed here issues the permit; the county office serves unincorporated areas. Every office links to its official page.

§ 08 · Wyoming FAQ

Questions framing contractors ask about Wyoming.

Q01Do framers need a license in Wyoming?+
Not from the state. Wyoming has no framing license; local contractor licensing applies where a city or county has adopted it (W.S. 16-6-1101).
Q02Can a Wyoming city require its own contractor license?+
Yes. Licensing is local in Wyoming, but W.S. 16-6-1101 requires every county, city, and town that licenses contractors to recognize an active, good-standing license from another Wyoming jurisdiction when you show a passing ICC (or equivalent) exam — no retesting, though it may require its own financial assurance and may deny a contractor it previously revoked or suspended.
Q03What lien notice do Wyoming contractors have to send?+
A prime contractor must send the record owner written notice of lien rights before receiving any payment, including advances; subcontractors and suppliers within 30 days of first furnishing work or materials (W.S. 29-2-112). Before filing, send a notice of intent at least 20 days ahead (§ 29-2-107); primes file within 150 days and others within 120 days (§ 29-2-106).
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: Local contractor licensing classes, exams, bonds, and fees in Cheyenne / Laramie County, Casper, Gillette, and other Wyoming cities and counties (local programs, outside this state-level record) · 2024–2026 session laws were not reviewed bill by bill (the wyoleg.gov bill-information service timed out); statute text was read from the Title PDFs compiled May 8, 2026

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.