HomeNew MexicoElectrical
ELECTRICAL x NEW MEXICO

Electrical contractor requirements in New Mexico.

CID licenses electrical businesses as EE-98 (residential, commercial, and industrial wiring at 5,000 volts or less; four years of experience) or ER-1 (residential one- and two-family dwellings and ground-floor-only multifamily, no more than four units per building; two years). Specialty licenses cover signs (ES-1), cathodic and lightning protection (ES-2), low-voltage systems under 50 volts (ES-3), telephone systems (ES-7), and well pumps (ES-10, ES-10R). Only EE-98 contractors may install raceways in or on buildings, with narrow exceptions.

Under 14.6.6.10 NMAC every individual performing electrical wiring needs a journeyman certificate matching the license (EE-98J requires four years of experience); apprentices work under direct supervision at no more than two per journeyman on commercial work and three on residential. EE-98J and EL-1J journeymen complete 16 hours of continuing education — 8 on code — in every three-year period. Electrical wiring is expressly excluded from the handyman exemption.

STATE LICENSE
RequiredNew Mexico Regulation & Licensing Departm…
STATUTE
NMSA 1978 §§ 60-13-12, 60-13-32(A), 60-13-38; 14.6.6.10 NMAC; 14.6.4 NMAC
RENEWAL
Contractor: up to 2 years · Journeyman: 3-year CE cycle16 hrs / 3 yrs for EE-98J and EL-1J journeymen (8 code)
VERIFIED
October 2026Official sources
FILE · ELECTRICAL x NEW MEXICO
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYNew Mexico Regulation & Licensing Department — Construction Industries Division (CID)
STATUTE / CODENMSA 1978 §§ 60-13-12, 60-13-32(A), 60-13-38; 14.6.6.10 NMAC; 14.6.4 NMAC
SCOPEStatewide · New Mexico
RENEWALContractor: up to 2 years · Journeyman: 3-year CE cycle
CONTINUING ED.16 hrs / 3 yrs for EE-98J and EL-1J journeymen (8 code)
LOCAL OFFICES3 counties on file
FILE ELECTRICALSCOPE STATEWIDE · NEW MEXICOTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe New Mexico rules for electrical contractors, verified against official sources.
LICENSE TRUTH
Electrical contracting in New Mexico requires a CID EE-98 or ER-1 electrical license, and everyone who wires must hold a CID journeyman certificate or work as a supervised apprentice — the handyman exemption never applies.
STATE ↔ LOCAL
CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How electrical work is governed in New Mexico.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — CODE
2020 New Mexico Electrical Code (14.10.4 NMAC)
NEC 2020 + NM AMENDMENTS
STATE — THE LICENSE
CID (NMSA 60-13; 14.6 NMAC)
EE-98 / ER-1 CONTRACTORJOURNEYMAN CERTIFICATESAPPRENTICE RATIOS
STATE / LOCAL — PERMITS
CID Electrical Bureau or local building department
ELECTRICAL PERMITINSPECTIONS

Read it bottom-up.

CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).

The local offices section below names the exact permit desk for every New Mexico county on file.

Source · New Mexico Regulation & Licensing Department — Construction Industries Division (CID)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
EE-98 or ER-1 Contractor LicenseEE-98: 4 years experience; ER-1: 2 years
CID (processed by PSI)
$36 application + $200 (EE-98) or $100 (ER-1) per 2-year term
Up to 2-year term
NMSA 1978 § 60-13-12; 14.6.6.10(B) NMAC; 14.5.5.8 NMAC
REQUIRED
Qualifying Party CertificateTrade exam plus Business & Law exam (or approved course)
CID / PSI
$36 QP application + PSI exam fees
Before licensing
NMSA 1978 § 60-13-16(B)
REQUIRED
Journeyman Certificate of CompetenceRequired of every individual performing electrical wiring; EE-98J needs 4 years
CID
$75 (CID fee page)
Before wiring
NMSA 1978 § 60-13-38(A); 14.6.6.10(A)(1) NMAC
REQUIRED
Journeyman Continuing EducationEE-98J and EL-1J: 16 hours, 8 on code, per 3-year period
CID-approved provider
Provider rate
Before each renewal
NMSA 1978 § 60-13-18(D); 14.6.4.8(H) NMAC
REQUIRED
$10,000 License BondCorporate surety
Surety
Premium on a $10,000 bond
Entire license term
NMSA 1978 § 60-13-49
REQUIRED
Electrical PermitResidential fees by service size per CID's fee page
CID / local building department
$45 (≤100 A) to $360 (>400 A) residential
Per project
CID fee schedule; 14.5.2.9(E) NMAC
REQUIRED
§ 03 · Year-One Cost

What it costs to start electrical in New Mexico.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
New Mexico · Electrical
QP + license applicationsPaid to PSI$72
EE-98 license feeTwo-year term; ER-1 is $100$200
Journeyman certificatePer CID fee page$75
$10,000 license bondCorporate suretyBond premium
Residential electrical permit≤100 A service $45 · 101–200 A $72 · 201–320 A $99$45–$360
Year-one floor$272 (EE-98) or $172 (ER-1) in PSI/CID fees + journeyman certificates, exams, and bond
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
No handyman wiring

The $7,200 handyman exemption expressly excludes electrical wiring (NMSA § 60-13-3(D)(14)).

NOTE
Raceways are EE-98 work

Specialty licensees may not install raceways in or on buildings; ER-1 licensees may install raceways incidental to residential wiring (14.6.6.10(A)(3) NMAC).

NOTE
Homeowner permits

A homeowner may wire their own home only after passing CID's homeowner electrical exam (75% to pass) and obtaining a homeowner permit (14.5.2.18 NMAC; CID FAQ).

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new electrical contractor in New Mexico. Actual agency processing times are noted in the ledger above.

1
STEP 1
Work as a supervised apprentice
Licensed employer
2
STEP 2
Journeyman exam + certificate (EE-98J: 4 yrs)
CID / PSI
3
STEP 3
Qualifying party exams + Business & Law
PSI
4
STEP 4
Bond + workers' comp; apply for EE-98 or ER-1
CID via PSI
5
STEP 5
16 CE hours per 3 years for journeymen
CID-approved provider
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
License before you bid
No bid may be submitted without a license covering the work — hold EE-98 or ER-1 or a classification whose scope includes it.
STATEESSENTIALNMSA 1978 § 60-13-12(A)–(B)
CIDIssuing authority
02
Put your license number on bids and permits
Omitting it from a written bid or permit application draws a $150 penalty fee.
STATEPAPERWORKNMSA 1978 § 60-13-19(A)–(B)
YouIssuing authority
03
Give the residential disclosure
Before residential work starts, a contract is signed, or money changes hands, disclose in writing on CID's form that the license and bond do not protect the consumer if you default.
STATECONSUMERNMSA 1978 § 60-13-19(C)
YouIssuing authority
04
Keep the $10,000 bond in force
A lapsed bond must be replaced within 40 days or the license is subject to revocation.
STATERESPONSIBILITYNMSA 1978 § 60-13-49(B)(5)
SuretyIssuing authority
05
Certify every wireman
Each person performing electrical wiring holds a journeyman certificate or works as an apprentice under direct supervision — 2:1 commercial, 3:1 residential.
STATESTAFFING14.6.6.10(A)(1)–(2) NMAC
CIDIssuing authority
§ 06 · Enforcement

What the law does about unlicensed electrical work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
NMSA 1978 § 60-13-52(A), (C)Statute

Unlicensed contracting

Acting as a contractor without the license the CILA requires is a misdemeanor prosecuted in magistrate or metropolitan court; a second conviction doubles the penalty, and CID says a violator becomes eligible for licensure one year after conviction.

ConsequenceWork ≤$5,000: up to 90 days jail and/or $300–$500 fine · work >$5,000: up to 6 months jail and/or fine of 10% of the work's value
§
NMSA 1978 § 60-13-30Statute

No suit, no lien

A contractor may not sue to collect compensation for licensed work without alleging and proving it was licensed when the claim arose, and an unlicensed contractor has no right to file a mechanic's lien.

ConsequenceLoss of the right to sue for payment and to lien
§
NMSA 1978 §§ 60-13-38(A), 60-13-52(B)Statute

Working without a journeyman certificate

Acting as a journeyman without a valid certificate of competence is a separate misdemeanor; a repeat conviction doubles it.

ConsequenceUp to 90 days jail and/or $100–$300 fine
§ 08 · New Mexico FAQ

Questions electrical contractors ask about New Mexico.

Q01Do I need a license to do electrical work in New Mexico?+
Yes. The business needs an EE-98, ER-1, or electrical specialty license from CID, and every individual wiring needs a journeyman certificate or must work as a supervised apprentice (NMSA §§ 60-13-12, 60-13-38; 14.6.6.10 NMAC).
Q02Can a homeowner wire their own house?+
Yes, with a permit. CID says a homeowner does not need an electrical contractor but must pass CID's homeowner electrical exam and obtain a homeowner electrical permit; only the permittee may do the work (14.5.2.18 NMAC).
Q03How much continuing education do electricians need?+
EE-98J journeyman electricians and EL-1J linemen need 16 hours — at least 8 on the current code — in every three-year period before renewal (14.6.4.8(H) NMAC).
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: License application fee: CID's licensing page lists a $36 application fee paid to PSI, while 14.5.5.8 NMAC as posted by the State Records Center still lists $30; license-fee amounts here ($100 or $200 per two-year term) come from 14.5.5.8 NMAC and may have been changed by a later rule not retrieved · PSI trade and Business & Law exam fees (published only in PSI Candidate Information Bulletins, not on an official state page) · Journeyman certificate fee: CID's fee page lists $75 for all journeyman certificates while 14.5.5.9 NMAC lists a $25 exam fee and $25-per-year renewal; the CID figure is used here · The renewal term and expiration date CID currently assigns (NMSA § 60-13-18(B) allows up to two years with staggered expirations; the current CID/PSI schedule was not retrieved) · Continuing education for electrical contractor licenses themselves — CID's CE page lists requirements only for EE-98J and EL-1J journeyman certificates

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.