FLOORING x NEW MEXICO

Flooring contractor requirements in New Mexico.

The CILA defines contracting as constructing, altering, repairing, or installing any building or structure (NMSA § 60-13-3(A)), and no one may act as a contractor without a license classified for the work (§ 60-13-12). 14.6.6 NMAC lists no flooring classification; it says any CID-regulated specialty not listed is issued a GS-29, with up to four years of experience set case by case. GB-2 and GB-98 general building licensees may install flooring within their scopes.

Small flooring jobs can fall under the handyman exemption — casual, minor work up to $7,200 in compensation a year, one project at a time, no advertising, and an annual declaration filed with CID. Structural subfloor and joist work is framing (GS-13), and tile or masonry walls are GS-16.

STATE LICENSE
ConditionalNew Mexico Regulation & Licensing Departm…
STATUTE
NMSA 1978 §§ 60-13-3, 60-13-12; 14.6.6.9(D)(20) NMAC
RENEWAL
Up to 2 years per term if licensed (NMSA § 60-13-18)None for general building contractors (per CID)
VERIFIED
October 2026Official sources
FILE · FLOORING x NEW MEXICO
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYNew Mexico Regulation & Licensing Department — Construction Industries Division (CID)
STATUTE / CODENMSA 1978 §§ 60-13-3, 60-13-12; 14.6.6.9(D)(20) NMAC
SCOPEStatewide · New Mexico
RENEWALUp to 2 years per term if licensed (NMSA § 60-13-18)
CONTINUING ED.None for general building contractors (per CID)
LOCAL OFFICES3 counties on file
FILE FLOORINGSCOPE STATEWIDE · NEW MEXICOTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe New Mexico rules for flooring contractors, verified against official sources.
LICENSE TRUTH
New Mexico's classification rule names no flooring license, but the Construction Industries Licensing Act covers altering or repairing any building, and CID issues unlisted specialties as GS-29 — confirm your classification with CID before bidding work above the $7,200 handyman limit.
STATE ↔ LOCAL
CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How flooring work is governed in New Mexico.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

STATE — THE ACT
CID (NMSA 60-13-3, -12)
CONTRACTING = ALTER / REPAIR BUILDINGSGS-29 FOR UNLISTED SPECIALTIES
STATE — EXEMPTION LINE
NMSA 60-13-3(D)(14); 14.6.2 NMAC
$7,200 / YEAR HANDYMANANNUAL CID DECLARATION
STATE / LOCAL — PERMITS
CID or the local building department
PERMITINSPECTIONS

Read it bottom-up.

CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).

The local offices section below names the exact permit desk for every New Mexico county on file.

Source · New Mexico Regulation & Licensing Department — Construction Industries Division (CID)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
GS-29 Specialty or General Building LicenseIf CID treats the flooring work as regulated contracting
CID (processed by PSI)
$36 application + $100 (GS-29) or $200 (GB) per 2-year term
Up to 2-year term
NMSA 1978 § 60-13-12; 14.6.6.9(D)(20) NMAC
CONDITIONAL
$10,000 License BondRequired of every CID licensee
Surety
Premium on a $10,000 bond
Entire license term
NMSA 1978 § 60-13-49
CONDITIONAL
Handyman ExemptionUp to $7,200 compensation a year, one project at a time, no advertising, annual CID declaration
Statute
Annual declaration filed with CID
Annual
NMSA 1978 § 60-13-3(D)(14); 14.6.2.8 NMAC
OPTIONAL
GS-13 Framing for Structural WorkSubfloor, joist, or other structural repairs
CID
$36 application + $100 per 2-year term
Per scope
14.6.6.9(D)(8) NMAC
CONDITIONAL
§ 03 · Year-One Cost

What it costs to start flooring in New Mexico.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
New Mexico · Flooring
Handyman declarationAnnual filing with CIDFiling
GS-29 license (if required)$36 QP application + $36 license application + $100 two-year fee$172
$10,000 license bond (if licensed)Corporate suretyBond premium
Year-one floor$0 under the handyman exemption · $172 + bond if a GS-29 is required
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
Ask CID first

Because 14.6.6 NMAC lists no flooring class and publishes no GS-29 list, confirm with CID's General Construction Bureau whether your flooring work needs a license.

NOTE
The $7,200 cap is annual

The handyman limit is total compensation per year across all jobs, not per job (§ 60-13-3(D)(14)).

NOTE
Lead-safe rules for old homes

Disturbing painted surfaces in pre-1978 housing during floor work triggers EPA's Renovation, Repair and Painting rule (40 CFR Part 745).

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new flooring contractor in New Mexico. Actual agency processing times are noted in the ledger above.

1
STEP 1
Confirm classification with CID
CID General Construction Bureau
2
STEP 2
Handyman declaration if staying under $7,200/yr
CID
3
STEP 3
Or document experience + pass exams for GS-29
PSI
4
STEP 4
Bond + workers' comp; apply for license
CID via PSI
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Get CID's answer in writing
Ask whether your flooring scope requires a GS-29 before bidding beyond handyman-level work.
STATEESSENTIAL14.6.6.9(D)(20) NMAC
CIDIssuing authority
02
Respect the handyman conditions
One project at a time, no advertising as a contractor, not part of a larger job, annual declaration, $7,200-a-year cap.
SCOPEEXEMPTIONNMSA 1978 § 60-13-3(D)(14)
YouIssuing authority
03
Sub the structural work
Joist or subfloor framing repairs belong to a GS-13 or general building licensee.
SCOPESPLIT RULE14.6.6.9(D)(8) NMAC
Licensed contractorIssuing authority
04
Follow RRP in pre-1978 homes
Use an EPA-certified firm and lead-safe practices when disturbing painted surfaces in older housing.
FEDERALLEAD40 CFR Part 745, Subpart E
EPAIssuing authority
§ 06 · Enforcement

What the law does about unlicensed flooring work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
NMSA 1978 § 60-13-52(A), (C)Statute

Unlicensed contracting

Acting as a contractor without the license the CILA requires is a misdemeanor prosecuted in magistrate or metropolitan court; a second conviction doubles the penalty, and CID says a violator becomes eligible for licensure one year after conviction.

ConsequenceWork ≤$5,000: up to 90 days jail and/or $300–$500 fine · work >$5,000: up to 6 months jail and/or fine of 10% of the work's value
§
NMSA 1978 § 60-13-30Statute

No suit, no lien

A contractor may not sue to collect compensation for licensed work without alleging and proving it was licensed when the claim arose, and an unlicensed contractor has no right to file a mechanic's lien.

ConsequenceLoss of the right to sue for payment and to lien
§ 08 · New Mexico FAQ

Questions flooring contractors ask about New Mexico.

Q01Do I need a license to install flooring in New Mexico?+
Possibly. The CILA covers altering and repairing buildings, but 14.6.6 NMAC names no flooring class and says unlisted CID-regulated specialties receive a GS-29. Confirm with CID; work within the $7,200-a-year handyman exemption needs no license.
Q02Is there a handyman exemption in New Mexico?+
Yes, but it is narrow. NMSA § 60-13-3(D)(14) excludes an individual doing casual, minor work on one project at a time up to $7,200 in compensation a year, who does not advertise as a contractor, whose work is not part of a larger operation, and who files an annual declaration with CID. It never covers electrical wiring, plumbing, or gas fitting.
Q03Can a general contractor install flooring?+
Yes. GB-2 and GB-98 licenses include all GS specialty work within their scopes (14.6.6.9(B) NMAC).
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: Whether CID requires a GS-29 specialty license for this work on its own — 14.6.6.9(D) NMAC says unlisted CID-regulated specialties are issued GS-29 but publishes no list of them · Current form name and any fee for the annual handyman declaration CID requires under § 60-13-3(D)(14)(c) · License application fee: CID's licensing page lists a $36 application fee paid to PSI, while 14.5.5.8 NMAC as posted by the State Records Center still lists $30; license-fee amounts here ($100 or $200 per two-year term) come from 14.5.5.8 NMAC and may have been changed by a later rule not retrieved · Whether residential flooring needs a permit — 14.5.2.9(B) NMAC deletes the IRC R105.2 exemption list items that include finish work such as tiling and carpeting, but CID's FAQ treats at least one deleted item (fences) as needing no permit

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.