PAINTING x NEW MEXICO

Painting contractor requirements in New Mexico.

The CILA's definition of contracting reaches anyone who alters or repairs a building for others (NMSA § 60-13-3(A)), and § 60-13-12 requires a license classified for the work. 14.6.6 NMAC has no painting classification — its only painting scope is GA-4 striping of roads and parking lots — and states that any CID-regulated specialty not listed is issued a GS-29. GB-2 and GB-98 licensees may paint within their scopes.

Painting work that stays within the handyman exemption — casual, minor jobs one at a time, up to $7,200 in compensation a year, no advertising, and an annual declaration to CID — needs no license. Separately, any paid renovation that disturbs paint in pre-1978 housing or child-occupied facilities falls under EPA's Renovation, Repair and Painting rule, which requires a certified firm and lead-safe work practices.

STATE LICENSE
ConditionalNew Mexico Regulation & Licensing Departm…
STATUTE
NMSA 1978 §§ 60-13-3, 60-13-12; 14.6.6.9(D)(20) NMAC; 40 CFR Part 745
RENEWAL
Up to 2 years per term if licensed (NMSA § 60-13-18)None for general building contractors (per CID)
VERIFIED
October 2026Official sources
FILE · PAINTING x NEW MEXICO
Compliance Dossier
Public
File
October 2026
STATE AUTHORITYNew Mexico Regulation & Licensing Department — Construction Industries Division (CID)
STATUTE / CODENMSA 1978 §§ 60-13-3, 60-13-12; 14.6.6.9(D)(20) NMAC; 40 CFR Part 745
SCOPEStatewide · New Mexico
RENEWALUp to 2 years per term if licensed (NMSA § 60-13-18)
CONTINUING ED.None for general building contractors (per CID)
LOCAL OFFICES3 counties on file
FILE PAINTINGSCOPE STATEWIDE · NEW MEXICOTYPE VERIFIED RULE FILE
VERIFIED October 2026STATUS PUBLIC REFERENCE
What this file settlesThe New Mexico rules for painting contractors, verified against official sources.
LICENSE TRUTH
New Mexico's classification rule names no painting license, but the Construction Industries Licensing Act covers altering or repairing any building and CID issues unlisted specialties as GS-29 — confirm with CID before painting above the $7,200 handyman limit, and follow EPA lead rules in pre-1978 homes.
STATE ↔ LOCAL
CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).
EVERY CLAIM SOURCED
Each requirement below carries its citation and official source. Facts we could not confirm are listed as pending — never asserted.
§ 01 · Permit Stack

How painting work is governed in New Mexico.

The state sets the license floor; the county or city permit office controls filing, inspections, and local rules wherever the job site sits.

FEDERAL — LEAD
US EPA (40 CFR Part 745)
RRP FIRM CERTIFICATIONLEAD-SAFE PRACTICES
STATE — THE ACT
CID (NMSA 60-13-3, -12)
GS-29 FOR UNLISTED SPECIALTIES$7,200 / YEAR HANDYMAN
STATE / LOCAL — PERMITS
CID or the local building department
PERMITINSPECTIONS

Read it bottom-up.

CID licenses contractors statewide under the Construction Industries Licensing Act; the license is the trade credential everywhere in New Mexico. Permits and inspections are issued by CID or, where a city or county runs its own building department, by that jurisdiction under codes adopted pursuant to NMSA § 60-13-44. A municipality may not require a licensed contractor to post an additional license bond (§ 60-13-51).

The local offices section below names the exact permit desk for every New Mexico county on file.

Source · New Mexico Regulation & Licensing Department — Construction Industries Division (CID)Last verified · October 2026
§ 02 · Specs Ledger

Every requirement, with a number on it.

Each row names the issuing authority, cost, timeline, citation, and status behind the requirement — verified against the official source.

RequirementIssued byCostTimeCitationStatus
GS-29 Specialty or General Building LicenseIf CID treats the painting work as regulated contracting
CID (processed by PSI)
$36 application + $100 (GS-29) or $200 (GB) per 2-year term
Up to 2-year term
NMSA 1978 § 60-13-12; 14.6.6.9(D)(20) NMAC
CONDITIONAL
Handyman ExemptionUp to $7,200 compensation a year, one project at a time, no advertising, annual CID declaration
Statute
Annual declaration filed with CID
Annual
NMSA 1978 § 60-13-3(D)(14); 14.6.2.8 NMAC
OPTIONAL
EPA RRP Firm Certification + Certified RenovatorPaid work disturbing paint in pre-1978 housing or child-occupied facilities
US EPA / accredited trainer
EPA firm fee + training rate
Before the job
40 CFR Part 745, Subpart E
CONDITIONAL
GA-4 StripingParking-lot and road striping
CID
$36 application + $100 per 2-year term
Up to 2-year term
14.6.6.9(A)(4) NMAC
CONDITIONAL
§ 03 · Year-One Cost

What it costs to start painting in New Mexico.

Published fees from the issuing authorities, as of October 2026. Local permit fees vary by project and jurisdiction — the basis is stated where a flat number does not exist.

Year-one ledger
New Mexico · Painting
Handyman declarationAnnual filing with CIDFiling
GS-29 license (if required)$36 QP application + $36 license application + $100 two-year fee$172
EPA RRP firm certificationPre-1978 housing workEPA fee
Year-one floor$0 under the handyman exemption · $172 + bond if a GS-29 is required
Excludes tools, vehicle purchase, payroll, and marketing.
NOTE
No painting class on the books

14.6.6 NMAC lists no painting classification; ask CID's General Construction Bureau whether your work needs a GS-29.

NOTE
Lead rules apply regardless

EPA's RRP rule applies to paid renovation of pre-1978 housing whether or not the state licenses painters.

NOTE
Striping is licensed

Painting stripes on roads and parking lots is the GA-4 classification; GB-98 also covers driveway and parking-lot striping.

§ 04 · Path to First Job

From day zero to first inspection.

A practical sequence for a new painting contractor in New Mexico. Actual agency processing times are noted in the ledger above.

1
STEP 1
Confirm classification with CID
CID General Construction Bureau
2
STEP 2
EPA RRP firm + renovator certification
US EPA / accredited trainer
3
STEP 3
Handyman declaration if under $7,200/yr
CID
4
STEP 4
Or qualify and apply for GS-29
CID via PSI
§ 05 · Compliance Checklist

Check them off.

Each item names the issuing authority, cycle, and citation.

01
Get CID's answer in writing
Ask whether your painting scope requires a GS-29 before bidding beyond handyman-level work.
STATEESSENTIAL14.6.6.9(D)(20) NMAC
CIDIssuing authority
02
Certify for lead-safe work
RRP firm certification and a certified renovator on pre-1978 housing jobs.
FEDERALLEAD40 CFR Part 745, Subpart E
EPAIssuing authority
03
Respect the handyman conditions
One project at a time, no advertising as a contractor, annual declaration, $7,200-a-year cap.
SCOPEEXEMPTIONNMSA 1978 § 60-13-3(D)(14)
YouIssuing authority
04
License striping work
Road and parking-lot striping needs GA-4 (or GB-98 for driveways and parking lots).
STATESCOPE14.6.6.9(A)(4), (B)(2) NMAC
CIDIssuing authority
§ 06 · Enforcement

What the law does about unlicensed painting work.

Statutory consequences with their citations — not estimates, not “commonly cited” guesses.

§
NMSA 1978 § 60-13-52(A), (C)Statute

Unlicensed contracting

Acting as a contractor without the license the CILA requires is a misdemeanor prosecuted in magistrate or metropolitan court; a second conviction doubles the penalty, and CID says a violator becomes eligible for licensure one year after conviction.

ConsequenceWork ≤$5,000: up to 90 days jail and/or $300–$500 fine · work >$5,000: up to 6 months jail and/or fine of 10% of the work's value
§
NMSA 1978 § 60-13-30Statute

No suit, no lien

A contractor may not sue to collect compensation for licensed work without alleging and proving it was licensed when the claim arose, and an unlicensed contractor has no right to file a mechanic's lien.

ConsequenceLoss of the right to sue for payment and to lien
§ 08 · New Mexico FAQ

Questions painting contractors ask about New Mexico.

Q01Do I need a license to paint houses in New Mexico?+
Possibly. 14.6.6 NMAC names no painting class, but the CILA covers altering and repairing buildings and CID issues unlisted regulated specialties as GS-29. Confirm with CID; work within the $7,200-a-year handyman exemption needs no license.
Q02Do lead paint rules apply?+
Yes. Paid work that disturbs paint in pre-1978 housing or child-occupied facilities requires an EPA-certified firm and lead-safe practices under 40 CFR Part 745.
Q03Is there a handyman exemption in New Mexico?+
Yes, but it is narrow. NMSA § 60-13-3(D)(14) excludes an individual doing casual, minor work on one project at a time up to $7,200 in compensation a year, who does not advertise as a contractor, whose work is not part of a larger operation, and who files an annual declaration with CID. It never covers electrical wiring, plumbing, or gas fitting.
§ 09 · Sources

Primary authorities, not secondary summaries.

Every fact in this file was checked against these official sources on October 2026.

Pending verification: Whether CID requires a GS-29 specialty license for this work on its own — 14.6.6.9(D) NMAC says unlisted CID-regulated specialties are issued GS-29 but publishes no list of them · Current form name and any fee for the annual handyman declaration CID requires under § 60-13-3(D)(14)(c) · License application fee: CID's licensing page lists a $36 application fee paid to PSI, while 14.5.5.8 NMAC as posted by the State Records Center still lists $30; license-fee amounts here ($100 or $200 per two-year term) come from 14.5.5.8 NMAC and may have been changed by a later rule not retrieved · Whether New Mexico runs an EPA-authorized RRP program or EPA administers RRP directly in the state (EPA administration assumed) · EPA RRP firm fee and recertification interval as currently published

General information, not legal advice. Always confirm requirements, deadlines, and forms with the issuing authority before filing or contracting.

These are the documents Iris tracks for you.

Store licenses, permits, policies, and renewal dates in one place.